91
Declaration of conformity during assembly
13
Declaration of conformity during assembly
The installer hereby declares/assures under his sole responsibility that the tail lift has been
fitted in accordance with ZEPRO’s instructions and that the assembly/delivery checks have
been carried out. The vehicle manufacturer’s instructions were also taken into account
when building the superstructure.
Because ZEPRO’s installation instructions have been followed and any modifications are
approved by ZEPRO,
this document constitutes confirmation that the tail lift and its installa
-
tion are in compliance with the following directives.
Machinery Directive 2006/42/EG
The installer hereby certifies that:
- installation was carried out according to ZEPRO’s instructions
- installation/delivery inspections have been performed
................................................................ ................................................................
Installer's signature
Date
................................................................
Serial number (manufacturing number)
See the type plate located on the tail lift frame.
Paste the enclosed copy of the type plate on the
back of the owner's manual.
14
Certificate of registration, delivery card
The delivery card must be registered in C-Care for the warranty to be valid.
The superstructure builder is responsible for registering the delivery card in C-Care (ww
-
w.c-office.com). User name and password are required to log in. There is no need to file
the attached paper copy of the delivery card supplied with the tail lift documentation after
registration in C-Care.
This is to certify that the delivery card is registered in C-Care:
................................................................ ................................................................
Superstructure builder (Company)
Date
Company details/stamp