
ZOM-12000-9v1
This manual contains proprietary information and is not to be copied or disclosed without written permission from
Zephyr International LLC.
Copyright 2002-2013 Page 12 of 24
BL-29900
Start Up
1. Install Hanging Hoist Mount, Arm using the pins and retaining pins
2. Install hoist on mount using the pins and retaining pins
3. Attach the Electrical harness connectors
4. Raise mount into position, install the pins in the load cells, lower chain
hoist to apply the load to the lead cells
5. Attach the 400Hz power cable to the receptacle
6. Turn on the 3 phase 400 hz power switch
7. Position the Zephyr GSE under hoist
8. Turn the Power switch on the control box to on, the load indicator should
illuminate
9. Activate the hoist select switch on the control box to select the BL-29900
hoist
10. Press the Tare button on the load display to zero out the load with no
load on the cable
11. Operate the hoist using pendant, or pilot override
12. Attach the rescue hoist cable to the Zephyr GSE and operate the hoist in
the down direction
13. Follow the operating instructions for the Zephyr GSE while running the
hoist
Shut Down
14. Disconnect the rescue hoist cable from the Zephyr GSE
15. Retract the cable to full in and insure the full up limit switch activates and
the bumper compresses properly
16. Turn of the Power switch on the control box
17. Press the 400 hz power switch to off
18. Detach the electrical harness connectors
19. Raise the rescue hoist mount with the chain hoist and remove pins
20. Lower hoist to lowest position
21. Remove the hoist and arm from the hoist mount