Fixed Hoist Test Facility Operation and Maintenance Manual 

ZOM-12000-2 rev 0 

 

Page 10 of 20 

 This manual contains proprietary information and is not to be copied or disclosed without written 
permission from Zephyr International LLC.   Copyright 4-1-2006 

 Control Frame  

 3 phase Input Power Receptacle  

Figure 14 

 
 
 
Mount the controls frame and the 3 phase input power 
receptacle as shown in figure 14. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Mount the Load Cell Readout and 28 VDC power supply box as shown on figure 15. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Figure 15 

 Load Cell Readout and 
power supply 

Содержание ZGS-12000-2

Страница 1: ...and is not to be copied or disclosed without written permission from Zephyr International LLC Copyright 4 1 2006 ZGS 12000 2 Fixed Hoist Test Facility FHTF Used in conjunction with the ZGS 10000 2 Mob...

Страница 2: ...with a chain hoist to raise the UUT up to the top of the structure where it is attached to two load cells The two load cells provide signals to a load cell summing box where the signals are summed and...

Страница 3: ...m performance set the hoist s limit switches adjust the levelwind and replace and condition the wire rope before the UUT is mounted onto the aircraft thus minimizing aircraft down time and flight time...

Страница 4: ...OM 12000 2 rev 0 Page 4 of 20 This manual contains proprietary information and is not to be copied or disclosed without written permission from Zephyr International LLC Copyright 4 1 2006 System Floor...

Страница 5: ...intenance Manual ZOM 12000 2 rev 0 Page 5 of 20 This manual contains proprietary information and is not to be copied or disclosed without written permission from Zephyr International LLC Copyright 4 1...

Страница 6: ...close proximity of its final position Insure the floor is clear of any debris before sliding the plate off the pallet into position o With two people or a crane stand up the I beam upright o Place th...

Страница 7: ...port as shown in figure 8 using two people or a crane and a ladder o Attach the upper weldment to the upright beam o Attach the two hoist support angles as shown o Attach the crane hoist with the U bo...

Страница 8: ...ly into place and attach it to the I beam with the adjustable cam followers provided As shown on figure 9 and 10 Adjust the 4 adjustable cam followers so there is 002 to 005 inches clearance between t...

Страница 9: ...l LLC Copyright 4 1 2006 Figure 12 Upper Pins Load Cells 2qty Load Cell Summing Box Figure 13 Lower Pins Attach the load cells and install the upper pins as shown in figure 12 Install the load cell su...

Страница 10: ...ied or disclosed without written permission from Zephyr International LLC Copyright 4 1 2006 Control Frame 3 phase Input Power Receptacle Figure 14 Mount the controls frame and the 3 phase input power...

Страница 11: ...section 4 3 1 With the UUT mounted on the hanging hoist mount with no load on it and with the mount attached to the load cells store the IN 1 value as the unscaled display reading shown and set the R...

Страница 12: ...enough to allow removing the pins from the lower load cell clevis Remove the pins and then lower the hanging mount to the lower position as shown in figure 16 Install the UUT onto the post mount and i...

Страница 13: ...d or disclosed without written permission from Zephyr International LLC Copyright 4 1 2006 Attach the plug from the Ground Power Cart to the receptacle provided Attach the 110 V AC power Attach the ZG...

Страница 14: ...n and Maintenance Manual ZOM 12000 2 rev 0 Page 14 of 20 This manual contains proprietary information and is not to be copied or disclosed without written permission from Zephyr International LLC Copy...

Страница 15: ...ith the Mobile RHGSE as shown on the cover of the manual ZOM 10000 2 describes the operation and maintenance of the Mobile RHGSE in detail A checklist is provided to facilitate system operation see pa...

Страница 16: ...stall hoist a Install electrical connectors and tighten b Insert 2 inch bolts or pins through one side 3 Raise hanging hoist mount a Install two load bolts b Lower chain hoist to apply load to load ce...

Страница 17: ...from mobile GSE 2 Raise and stow hook against hoist bell mouth 3 Turn Indicator Switch off 4 Push Circuit Breaker Switch off 5 Remove mobile GSE from under the rescue hoist 6 Detach connectors from ho...

Страница 18: ...ion and Maintenance Manual ZOM 12000 2 rev 0 Page 18 of 20 This manual contains proprietary information and is not to be copied or disclosed without written permission from Zephyr International LLC Co...

Страница 19: ...M 12000 2 rev 0 Page 19 of 20 This manual contains proprietary information and is not to be copied or disclosed without written permission from Zephyr International LLC Copyright 4 1 2006 Assembly Dra...

Страница 20: ...y Operation and Maintenance Manual ZOM 12000 2 rev 0 Page 20 of 20 This manual contains proprietary information and is not to be copied or disclosed without written permission from Zephyr Internationa...

Отзывы: