
Fixed Hoist Test Facility Operation and Maintenance Manual
ZOM-12000-7 rev 0
Page 7 of 24
This manual contains proprietary information and is not to be copied or disclosed without written
permission from Zephyr International LLC. Copyright 2006-2008
Assembly of FHTF:
o
Unpack the crates and verify all the parts arrived in good condition.
o
Use a forklift and lift the base weldment off the pallet and place it close to its
final position.
o
Attach the base attachment angles to the I Beam using the labels to align each
bracket properly
Base Attachment Angles
I Beam