
Fixed Hoist Test Facility Operation and Maintenance Manual
ZOM-12000-7 rev 0
Page 20 of 24
This manual contains proprietary information and is not to be copied or disclosed without written
permission from Zephyr International LLC. Copyright 2006-2008
System Procedures:
System Startup Procedure
Turn on the load indicator switch and allow the indicator to start up. Depending on the
calibration method used the load indicated is either zero or is the combined weight of
the UUT and the hanging hoist mount. To zero the reading press the Tare button on
the load indicator panel and the load indicated should go to zero.
System Operating Procedure
The system is design to be operated in conjunction with the Mobile RHGSE as shown
on the cover of the manual. ZOM-10000-5 describes the operation and maintenance
of the Mobile RHGSE in detail.
A checklist is provided to facilitate system operation, see page 21 and 22.
Test Procedures:
Test procedures are as described in the OEM’s operation and maintenance manual.
Detailed test procedures are not included herein as they are out of the scope of this
instruction manual.
System Maintenance
The connections to the UUT should be capped and stored in such a position that dirt is
not entrained into the system.
Attachments:
o
Electrical
Schematic ZGS-12216-2
o
Component
Manuals
o
Load Cell Final Calibration Sheets
o
Strain Gage Panel Meter User’s Guide