20
Verona Island Use, Care, and Installation Guide
V E R O N A
I S L A N D
C O R E
Installation Instructions
Mounting the Hood
FIG. G
FIG. H
11. Remove tape securing electronics mounting bracket to hood. Position electronics mounting
bracket and secure to hood body using (3) M4 x 8 truss head sheet metal screws as shown in (FIG.
G).
12. Lift hood body and align the (4) pre-installed mounting screws on top of blower housing (FIG. C5
on Page 17) with the (4) key holes on the bottom of the support frame. (FIG. H) Slide hood towards
the narrow end of key holes to lock in place. Hand tighten each of the (4) screws to secure hood
to bottom of support frame. Install (1) M4 x 12mm safety screw into bottom support frame to
further secure the hood. (FIG. H).
13. Install electrical and duct work. Seal duct work with aluminum duct tape.
14. Power up hood, verify all functions and check for leaks around duct tape.
Содержание Verona Island ZVN-M90BG
Страница 2: ...2 Verona Island Use Care and Installation Guide VERONA ISL AND CORE...
Страница 35: ...35 Verona Island Use Care and Installation Guide ZEPHYRONLINE COM Notes...
Страница 36: ...36 Verona Island Use Care and Installation Guide VERONA ISL AND CORE Notes...
Страница 40: ...2 Verona Island Guide d utilisation d entretien et d installation VERONA LE CORE...
Страница 73: ...35 Verona Island Guide d utilisation d entretien et d installation ZEPHYRONLINE COM Remarques...
Страница 74: ...36 Verona Island Guide d utilisation d entretien et d installation VERONA LE CORE Remarques...