17
Verona Island Use, Care, and Installation Guide
ZEPHYRONLINE.COM
Installation Instructions
Mounting the Hood
Ceiling Preparation
1. Determine hood mounting location and
temporarily tape paper template (included with
the hood) to the ceiling.
2. Cut-out internal shaded area of template
to allow the ducting and electrical to pass
through.
3. Add wood blocking (min. 2” x 4”) onto ceiling
joists to reinforce ceiling above the drywall.
(FIG. C1).
4. Secure (2) 1-1/2” wood screws into points A
and B of the paper template (FIG. B). Do not
completely tighten screws, leave approximately
1/4” exposed.
Hood Preparation
5. Remove screws securing top and bottom
support frames together.
6. Adjust support frame to accommodate the
desired hood height and re-assemble the frame
using the previously removed screws (2 screws
for each support frame arm). (FIG. C2).
3
1
2
6
5
4
Ceiling Joists
Wood Blocking
Top Support Frame
Bottom Support Frame
Hood Body/Canopy
front
FIG. C
Hood is intended to be mounted to a finished
ceiling.
CAUTION
A
B
Front of Hood
C L
/
Cut-Out Shaded Area
FIG. B
Содержание Verona Island ZVN-M90BG
Страница 2: ...2 Verona Island Use Care and Installation Guide VERONA ISL AND CORE...
Страница 35: ...35 Verona Island Use Care and Installation Guide ZEPHYRONLINE COM Notes...
Страница 36: ...36 Verona Island Use Care and Installation Guide VERONA ISL AND CORE Notes...
Страница 40: ...2 Verona Island Guide d utilisation d entretien et d installation VERONA LE CORE...
Страница 73: ...35 Verona Island Guide d utilisation d entretien et d installation ZEPHYRONLINE COM Remarques...
Страница 74: ...36 Verona Island Guide d utilisation d entretien et d installation VERONA LE CORE Remarques...