12
www.zephyronline.com
Installation –
External Blower Preparation
1. Place 8” round adapter on top of power pack
and secure with (4) M4x8 screws. Connect 8”
round duct work to 8” round adapter.
2. Install threaded end of external blower wiring
through external blower wiring knock out
(B)
located in junction box on top of power pack.
3. Place cap over threaded end of external blower
wiring and secure by turning clockwise.
4. Connect 6 pin male connector from blower
wiring to 6 pin female connector in the power
pack. (plug is located inside the power pack
protruding from the white control board box).
NOTE: For instructions on mounting the external blower, please refer to the CBE-1000 manual included
in the external blower packaging and on our website: www.zephyronline.com
CBE-1000: WIRING DIAGRAM
White (common)
Black (high)
Blue (med)
Red (low)
Green (ground)
External Blower
Wiring Box
(hood)
Junction Box
(CBE-1000)
B
B
A
A: Ground wire screw
location (inside)
5. Secure green ground wire from external
blower wiring to ground screw located
inside the power pack
Содержание Tornado II AK8200AS
Страница 2: ...www zephyronline com...