12
www.zephyronline.com
1.
5HPRYHEDIÀH¿OWHUVE\
1)
3XOOLQJ¿OWHUWRZDUG
front of liner.
2)
3LYRWLQJUHDURI¿OWHUGRZQ
2.
Remove grease tray by:
1)
Pulling up on tray to
release from bottom panel.
2)
Lifting tray out of
liner body.
3.
,IDSSOLFDEOH5HPRYHOHIWDQGULJKWVLGHVSDFHU
SDQHOVE\UHPRYLQJVFUHZVIURPEHKLQGHDFK
panel.
1
2
1
1
2
Locking Tabs
Bottom Panel Screws
2
1
4.
Remove bottom panel by:
1)
5HPRYLQJ
screws from left and right sides of bottom panel.
2)
Pulling bottom panel toward front of liner to
release from locking tabs.
6.
5HPRYHEORZHUIURPOLQHUE\UHPRYLQJWKH
3/16” x 3/8” screws from the top of the liner. Set
screws aside for later usage.
5
. Disconnect blower molex plug.
Installation –
Horizontal Ducting Preparation
Содержание Monsoon DCBL AK9428AS
Страница 2: ...www zephyronline com...
Страница 23: ...21 Fan Curve Diagrams...
Страница 28: ...www zephyronline com...