23
Tempest I Use, Care, and Installation Guide
ZEPHYRONLINE.COM
Installation Instructions
PBD-1200A Dual Blower Installation
4. Install dual blower plate from
PBD-1200A kit into hood body.
Attach by (4) screws previously
removed from step 3.
5. Install previously removed blower
onto one side of dual blower plate
and attach by (4) previously
removed screws from step 2.
6. Install blower from PBD-1200A
kit onto other side of dual blower
plate by (4) 3/16 x 3/8 screws.
Содержание AK7000CS
Страница 2: ...2 Tempest I Use Care and Installation Guide TEMPEST I UNDER CABINET PRO...
Страница 41: ...41 Tempest I Use Care and Installation Guide ZEPHYRONLINE COM Notes...
Страница 42: ...42 Tempest I Use Care and Installation Guide TEMPEST I UNDER CABINET PRO Notes...
Страница 46: ...2 Tempest I Guide d utilisation d entretien et d installation TEMPEST I SOUS ARMOIRE PRO...
Страница 85: ...41 Tempest I Guide d utilisation d entretien et d installation ZEPHYRONLINE COM Remarques...
Страница 86: ...42 Tempest I Guide d utilisation d entretien et d installation TEMPEST I SOUS ARMOIRE PRO Remarques...