background image

Q

Q

Q

QUICK SETUP GUIDE

UICK SETUP GUIDE

UICK SETUP GUIDE

UICK SETUP GUIDE

 

 

 Zensol Automation Inc.                                    

www.zensol.com

 

 

28 

 

STEP 7 – SYMBOLIC CIRCUIT DIAGRAM 

 
 
 

 
 
 
 
 

Содержание TAP-4

Страница 1: ...Zensol Automation Inc www zensol com COMPUTERIZED TEST EQUIPMENT ZENSOL ON LOAD TAP CHANGER ANALYZER OpenZen Universal Data Recording Software Quick Setup Guide TAP 4 August 13th 2013...

Страница 2: ...INDOWS VISTA 7 8 9 STEP 3E CONTENTS OF THE OPENZEN FOLDER 10 STEP 4 COMMUNICATION USB DRIVER INSTALLATION OR FIBER OPTIC INSTALLATION 11 STEP 4A FIRST INSTALLATION 11 STEP 4B IF THE FOUND NEW HARDWARE...

Страница 3: ...TUP GUIDE QUICK SETUP GUIDE Zensol Automation Inc www zensol com 2 STEP 1 REQUIRED HARDWARE TAP 4 Power cable USB cable Ground cable Accelerometer with calibration card 10 32 cable BNC cable male fema...

Страница 4: ...p 1a Accessories Current Clamp In input 1 plug the AC DC current clamp and install it on a current wire from the tap changers motor as shown on the following picture Accelerometers In the other inputs...

Страница 5: ...RAW Signals 1 Current 2 Accelerometer 1 3 Accelerometer 2 4 Accelerometer 3 Envelopes Signals 100 Current 101 High Frequency Envelope Accelerometer 1 102 Low Frequency Envelope Accelerometer 1 103 Hig...

Страница 6: ...QUICK SETUP GUIDE QUICK SETUP GUIDE QUICK SETUP GUIDE QUICK SETUP GUIDE Zensol Automation Inc www zensol com 5 Step 2b Connections to the tap changer...

Страница 7: ...TURE Step 3a Downloading the application from the Zensol website Go to www zensol com and in the products menu select TAP 4 OLTC Analyzer In the product page of the TAP 4 scroll down to the CUSTOMERS...

Страница 8: ...n the icon for the file you downloaded Select Extract to note this example uses WinZip other extractors may vary in their method or file for latest version and date Select the folder of your choice an...

Страница 9: ...not be executed Double click on the icon for the file you just downloaded or file for latest version and date Click the Extract button note this example uses WinZip other extractors may vary in their...

Страница 10: ...nd installing on Windows Vista 7 8 Right click on the icon for the file you just downloaded exact file name will depend on version downloaded Enter the destination folder where you want the files deco...

Страница 11: ...tains the program the USB driver a reference file cbawxwin cba default test plans default wcf calculation files cbacal cal Calibration folder This contains the calibration file Docs folder This folder...

Страница 12: ...lug the TAP 4 into a free USB port In this window select Install from a list or specific location and click Next Now select Search for the best driver in these locations and Include this location in t...

Страница 13: ...is not launched Click Windows button bottom left of your desk then control panel in the right row This window appears Select Device Manager then click right on USB Serial Port Choose to Update Driver...

Страница 14: ...feature of the driver the virtual COM port which is not necessary for our application Go into the device manager as seen in previous page and locate your device under the USB branch Double click on i...

Страница 15: ...need to re install it from the Device Manager of Windows located in the systems properties To get to the device manager Go into the control panel of Windows Double click on the icon System Go into the...

Страница 16: ...p 5a Language configuration Run the executable file OpenZEN TAP EXE or file of latest version The first time it is run you will be prompted to choose for the default language Select English and click...

Страница 17: ...IDE UICK SETUP GUIDE Zensol Automation Inc www zensol com 16 Step 5b Main window Toolbar Number and Name of the Test Number and Name of the Page File name Signals information Calculus related to data...

Страница 18: ...ode Test configuration Check setup Previous graphic page Open plan Informations Previous Test Next graphic page Save raw data only Analog inputs Next Test Examine time amplitude Save Hydro Quebec enve...

Страница 19: ...SETUP GUIDE UICK SETUP GUIDE Zensol Automation Inc www zensol com 18 Step 5c Data structure RAW DATA DEFAULT_CHECK_TAP4 wdt EXCEL TAP Report_English xls TEST PLAN DEFAULT_CHECK_TAP4 wcf CALCULUS CBAC...

Страница 20: ...ion Inc www zensol com 19 Step 5d Calibration checkup Once the Verification button is pressed the software connects to your instrument reads the calibration data and applies it to your test plan It ha...

Страница 21: ...on A welcome window will appear asking you what you want to do Select the test plan generator and click continue In this screen you can write down all the necessary information about your tests If you...

Страница 22: ...s Once you have verified the calibration in the previous step you can scale this calibration to the real values you measure A good habit to have is to save the test plan once our calibration data is e...

Страница 23: ...nputs The same thing is done with the accelerometers inputs The unit of measurement is in G 0 Note If you don t know precisely the calibration value we recommend writing 100 mv g for a 50g max scale F...

Страница 24: ...st launched would be 8 If you have configured your tests with the TRIG once the test is launched you can change taps on your tap changer when you see the Measure LED light up on the front panel of the...

Страница 25: ...lete click on the Save button in the main window s button bar It is also possible via the menu under File Save Data as To save only the envelopes smaller files you only have to choose the option Save...

Страница 26: ...r examples of OpenZen TAP 2 In the window Processing load the excel report that you want as shown below 3 Click on the last red button to do the export 4 Excel file specified in the processing window...

Страница 27: ...test plan if you want to verify your hardware before real tests In the main window s button bar click the Assistant Mode button The welcome window will appear asking what you want to do Select Load an...

Страница 28: ...change tests use the blue arrows Test 1 AC Clamp Test Plug a small wire between the two Current connectors The AC clamp must pass through the wire and be plugged in the input 1 as seen in the image be...

Страница 29: ...Q Q Q QUICK SETUP GUIDE UICK SETUP GUIDE UICK SETUP GUIDE UICK SETUP GUIDE Zensol Automation Inc www zensol com 28 STEP 7 SYMBOLIC CIRCUIT DIAGRAM...

Отзывы: