background image

Page 6 of 12 

 Zenith Econoboil - Installation & Operating Instructions - 804544NZ - 03.17 v1.00

Installation Procedures 

Continued

Step 4 – Tap installation

Thread tape

2. Before installing the tap, ensure enough 

thread tape is applied to the thread. 

3. Turn the tap fully clockwise to the end stop 

and stopped at upright position. 

4. Use the spanner to tighten the lock nut an-

ti-clockwise.

1. Fit the cover to the unit and 

fi

 x with 

screws top and bottom.

Lock nut

Installation Procedures 

Continued

For a concealed electrical connection, disconnect the pre-fitted flex and 

plug cable at the PCB connector and discard. Connect the concealed 

power cable through the rear access opening to the green terminal 

block on the PCB. 
For concealed electrical connection, an isolation switch should be 

installed. 
Check that the earth is connected through the PCB to the chassis with 

an ohm meter.

Warning: Do not connect both options. It is essential that the flex and 

plug cable is removed from the PCB if the concealed connection is 

used. Otherwise the GPO plug will become live.

Содержание Econoboil 301642

Страница 1: ...804544NZ 03 17 v1 00 Page 1 of 12 Zenith Econoboil Installation and Operating Instructions 301642 Zenith Econoboil 1 5 litre White 303642 Zenith Econoboil 3 0 litre White 305642 Zenith Econoboil 5 0...

Страница 2: ...al capabilities or lack of experience and knowledge unless they have been given supervision or instruction concerning use of the appliance by a person responsible for their safety For products sold in...

Страница 3: ...er supply Do not use strong corrosive or abrasive cleaners to clean the case of the heater Frost protection If this heater is located where ambient air temperature could fall below 5 C when the heater...

Страница 4: ...ion the base of the tap to be not less than 200 mm above the draining board height should be increased only if essential for filling larger vessels Provide clearance for service access of not less tha...

Страница 5: ...g A vent at the base of the heater must be plumbed to a safe visible location as under certain conditions it may discharge cold or boiling water and or steam For exposed vent plumbing connect vent out...

Страница 6: ...top and bottom Lock nut Installation Procedures Continued For a concealed electrical connection disconnect the pre fitted flex and plug cable at the PCB connector and discard Connect the concealed po...

Страница 7: ...ust be manually returned Pull handle down for water flow than release Tap Operation Zenith Econoboil is fitted with a two way safety tap for instant boiling water For instant boiling water gently pull...

Страница 8: ...Earthing Continuity Verification Warning this appliance must be earthed Following remedial service the earthing continuity of the heater must be checked by a qualified technician using an appliance te...

Страница 9: ...Zenith Econoboil Installation Operating Instructions 804544NZ 03 17 v1 00 Page 9 of 12 Wall Mounting Template Dimensions ROG QOHW 9HQW WHUQDO 3OXPELQJ OHFWULFDO LULQJ QWHUQDO 3OXPELQJ 3RVLWLRQLQJ SLQ...

Страница 10: ...4454NZ Cistern Tank 15 94455NZ Ball Valve assy 16 94456NZ Cistern Gasket 17 94457NZ Cistern Lid EB AB 18 93118NZ Elbow Stem 1 4 19 90100NZ Grommet Cistern to Tank 20 94458NZ Overload 21 94459NZ Side r...

Страница 11: ...Zenith Econoboil Installation Operating Instructions 804544NZ 03 17 v1 00 Page 11 of 12 Exploded View Diagram...

Страница 12: ...out prior notice Images in this booklet have been modified and may not be true representations of the finished goods The standard cup referred to in this publication is 167 ml 6 fl oz 2017 Zenith Heat...

Отзывы: