background image

Page 4 of 12 

 Zenith Econoboil - Installation & Operating Instructions - 804544NZ - 03.17 v1.00

d)  Outlet drainage to a sink draining board or to a drip tray.
e)  Access to drainage from a vent situated at the base of the heater.
f)  If the water pressure is likely to exceed 700 kPa, a 350 kPa pressure 

reducing valve must be installed in the cold water supply line.

g)  In all installation instances the walls of the heater must be vertical 

and the base horizontal, there can be no exceptions to this rule.

Before You Begin

Read the installation and operating instructions completely.
Decide whether to install with concealed or exposed plumbing and/or 

electrical connections. Concealed connections are preferred for superior 

appearance.

Step 1 – Positioning

Position the heater so the tap will drain on to a draining board or drip 

tray.
Position the base of the tap to be not less than 200 mm above the 

draining board (height should be increased only if essential for filling 

larger vessels).
Provide clearance for service access of not less than 150 mm top, 65 

mm left, 20 mm right.
Mark corner positions for the heater on the wall so as to position the 

paper mounting-hole template. 

Step 2 – Fastening

Refer to mounting hole template on page 9, select correct model and 

drill holes where shown. 

Remove cover fastening screws from heater and lift whole cover off 

heater.
Install plumbing and prepare pipe ends as required.
Screw heater chassis to the wall using screws or bolts suited to the 

walling.
Screws or bolts must be capable of supporting the heater weight when 

filled. (Refer to table to the left).

Installation Procedures

Approximate Weight When Filled

150 mm

minimum 

clearance

20 mm 

minimum

clearance

from right 

edge to wall

200 mm

65 mm

Installation Requirements 

continued

1.5 Litre model

10 kg

3 Litre model

12.5 kg

5.0 Litre model

16.5 kg

7.5 Litre model

20.5 kg

Содержание Econoboil 301642

Страница 1: ...804544NZ 03 17 v1 00 Page 1 of 12 Zenith Econoboil Installation and Operating Instructions 301642 Zenith Econoboil 1 5 litre White 303642 Zenith Econoboil 3 0 litre White 305642 Zenith Econoboil 5 0...

Страница 2: ...al capabilities or lack of experience and knowledge unless they have been given supervision or instruction concerning use of the appliance by a person responsible for their safety For products sold in...

Страница 3: ...er supply Do not use strong corrosive or abrasive cleaners to clean the case of the heater Frost protection If this heater is located where ambient air temperature could fall below 5 C when the heater...

Страница 4: ...ion the base of the tap to be not less than 200 mm above the draining board height should be increased only if essential for filling larger vessels Provide clearance for service access of not less tha...

Страница 5: ...g A vent at the base of the heater must be plumbed to a safe visible location as under certain conditions it may discharge cold or boiling water and or steam For exposed vent plumbing connect vent out...

Страница 6: ...top and bottom Lock nut Installation Procedures Continued For a concealed electrical connection disconnect the pre fitted flex and plug cable at the PCB connector and discard Connect the concealed po...

Страница 7: ...ust be manually returned Pull handle down for water flow than release Tap Operation Zenith Econoboil is fitted with a two way safety tap for instant boiling water For instant boiling water gently pull...

Страница 8: ...Earthing Continuity Verification Warning this appliance must be earthed Following remedial service the earthing continuity of the heater must be checked by a qualified technician using an appliance te...

Страница 9: ...Zenith Econoboil Installation Operating Instructions 804544NZ 03 17 v1 00 Page 9 of 12 Wall Mounting Template Dimensions ROG QOHW 9HQW WHUQDO 3OXPELQJ OHFWULFDO LULQJ QWHUQDO 3OXPELQJ 3RVLWLRQLQJ SLQ...

Страница 10: ...4454NZ Cistern Tank 15 94455NZ Ball Valve assy 16 94456NZ Cistern Gasket 17 94457NZ Cistern Lid EB AB 18 93118NZ Elbow Stem 1 4 19 90100NZ Grommet Cistern to Tank 20 94458NZ Overload 21 94459NZ Side r...

Страница 11: ...Zenith Econoboil Installation Operating Instructions 804544NZ 03 17 v1 00 Page 11 of 12 Exploded View Diagram...

Страница 12: ...out prior notice Images in this booklet have been modified and may not be true representations of the finished goods The standard cup referred to in this publication is 167 ml 6 fl oz 2017 Zenith Heat...

Отзывы: