Start-Up 

(cont.)

4. Start the pump and accelerate to 30 rpm

or to the lowest set point of speed for the
application, whichever is less.

Watch the

point of discharge for evidence of
fluid. If no discharge is seen after 10
revolutions of the shaft shut down the
pump and check for obstructions in
the system and proper pump rotation.
This is assuming a connection can be
broken within a few inches of the
pump outlet port, where the flow would
be evident within several seconds. If
the distance between the pump outlet
and the point of discharge inspection
were long, more time would be needed
before flow is confirmed. This is more
risky, and damage to the pump might
result if it is run dry for more than 30
seconds. 

Note:

The pump will discharge a cloud of
bubbles when it is started, but this
will subside when the air is purged
from the pump. This is a normal
part of pump startup. 

5.

When smooth flow is seen at the dis-
charge the pump and system can be
gradually brought up to normal oper-
ating speeds and pressure. Listen for
unusual sounds when first starting the
pump and turn the pump off immedi-
ately if any are heard. Investigate for
causes of distress.

6.

If, at any time during operation, the
pump does not appear to be running
smoothly, stop the pump immediately
to avoid serious internal damage.

Flushing of the product piping

Take care when flushing the pump or

downstream process equipment using
the Zenith precision metering pump as
the flushing pump. The pump must be
able to withstand the solvent or flushing
agent as well as the product, and the

operating speed and pressure during
flushing must still fall within the applicable
range for the C-9000 product. 

If it is necessary to flush the system,

the following suggestions are recom-
mended to prevent pump damage:

1.

Minimize the differential pressure
across the pump ports to less than
100 psi, but not less than 20 psi.

2.

Reduce the pump speed to an
acceptable level, approximately 
50-100 rpm.

3.

Flush the pump for the shortest 
allowable time, yielding effective
cleansing of the system, and no
longer than necessary.

4.

Another alternative is to use a bypass
around the pump, as illustrated in

Figure 2

, this will allow for high velocity

flushing of the downstream system
while minimizing risk to the metering
pump. During the flush cycle, run the
pump slowly. The fluid will pass
through and around the pump. This
will allow the system to be flushed
quickly and effectively.

5.

If it is necessary to also flush the seal
housing, and the discharge pressure
is higher than the suction pressure
(during flushing cycle), connect the
seal housing drain to the suction line
(dotted line on 

Figure 2

).

Pump

Valve

Bypass

Figure 2

Care During
Operation

How does the pump work?

Fluid enters the pump through the

inlet port located in the front plate and
fills the gear pocket. As the gears rotate,
a precise amount of fluid is trapped
between the side walls of the gear 
pockets and gear teeth.

The metered fluid is transported by the

rotation of the gears to the discharge side
of the pump where the gear teeth come
into mesh. This action forces the fluid out of
the gear teeth and through the outlet port

located in the front plate. The pressure
developed is determined by the pump
size, the gear clearances, pump speed,
fluid viscosity and impedance to flow.

How fast can I run the pump?

Pump speed is limited by practical

considerations. If a high viscosity fluid is
being metered and pump speed is
increased beyond a certain point, the
fluid may not be able to fill the gear teeth
spaces, and the pump will not obtain
enough fluid to maintain normal volumetric

Содержание C-9000

Страница 1: ...Zenith Pumps Installation Care and Maintenance Zenith Corrosive Duty Gear Pumps C 9000 Gear Pumps...

Страница 2: ...re assured even under varying conditions of temperature viscosity and pressure Precision Construction Ground and lapped components allow for operating clearances to 00015 and provide high volumetric e...

Страница 3: ...ust be considered in order to prevent damage to the product during handling installation and cleaning Most importantly 1 Use only brass or plastic tools to pry on the C 9000 pump components 2 If you m...

Страница 4: ...e to the pump inlet when metering high viscosity fluids to prevent cavitation 10 Install a pressure regulating valve downstream of the pump if necessary to ensure there is at least 20 psig differentia...

Страница 5: ...e system the following suggestions are recom mended to prevent pump damage 1 Minimize the differential pressure across the pump ports to less than 100 psi but not less than 20 psi 2 Reduce the pump sp...

Страница 6: ...a given orifice For de rating the pump this orifice is the gear clearance Differential pressure forces the fluid through this clearance at a steady rate regardless of the pump speed Thus the slip flow...

Страница 7: ...magnets near one another unless assembling the pump to the system Both rotors should be fastened to their respective shafts before bringing them into proximity Do not place the magnets near any elect...

Страница 8: ...system for example magnetically driven pumps with adapter plates have been disengaged from the housings Note As parts are disassembled place them carefully on a clean surface such as a soft cloth See...

Страница 9: ...ry Take care not to press on the gears or the edges of the gear pocket Caution Do not allow the gears to be lifted out of the gear plate They may drop causing damage to the gear teeth See Figure 5 9 R...

Страница 10: ...e Assembly 8 O Ring 33 O Ring 34 Tandem Lip Seal 13 Dryseal Type Plug 42 Interpret per ASME Y14 5M 1994 Square Key 17 18 SHCS M4x 0 7 11 Seal Housing 23 Sleeve Bearing 16 Retaining Ring 24 Sleeve Bear...

Страница 11: ...cleaning method Abrasive dust is larger in size than the pump clearances Always use clean lint free rags or disposable towels and compressed air to clean components Common paper towels are not accept...

Страница 12: ...igned 1 Insert the o rings 34 into the grooves on the front and rear plates 8 7 Replace these o rings if they have been damaged 2 Place the front plate 8 in a vise that has soft protective jaws Grip t...

Страница 13: ...plate Lower the barrier cap into position over the inner magnet If applicable mount the barrier cap by installing tightening the eight socket head screws Assembly is now complete 13 Mechanical Seal In...

Страница 14: ...Entrained particle Disassemble and clean pump replace any damaged parts 4 Possible internal Disassemble and clean damage pump replace damaged parts Consult factory Excessive seal 1 Worn seal face s Re...

Страница 15: ...sers that won t scratch Don ts Don t pry tap scratch scrape or otherwise work on the pump or its components with steel tools Don t assume that because it is steel you can t damage the pump in handling...

Страница 16: ...of operating conditions and applications for these products or systems the user through its own analysis and testing is solely responsible for making the final selection of the products and systems a...

Отзывы: