Page 4 of 24
804545NZ - BW_AB Small_09.18 v1.02
e) Access to drainage from a vent situated at the base of the heater.
f) If the water pressure is likely to exceed 700 kPa, a 350 kPa pressure
reducing valve must be installed in the cold water supply line.
f) In all installation instances the walls of the heater must be vertical and
the base horizontal, there can be no exceptions to this rule.
Before You Begin
Refer to the mounting-hole template on page 17.
Read the installation and operating instructions completely.
Decide whether to install with concealed or exposed plumbing and/or
electrical connections. Concealed connections are preferred for superior
appearance.
Step 1 – Positioning
Position the heater so the tap will drain on to a draining board or drip tray.
Position the base of the tap to be not less than 300 mm above the
draining board (height should be increased only if essential for filling larger
vessels).
Provide clearance for service access of not less than 100 mm top, 150 mm
left, 20 mm right.
Mark corner positions for the heater on the wall so as to position the paper
mounting-hole template.
Step 2 – Fastening
Position mounting-hole template on wall and drill holes where shown.
Remove cover fastening screws from heater and lift whole cover off heater.
Remove filter guide as shown in picture above.
Install plumbing and wiring and prepare pipe ends and wiring ends as
shown.
Screw heater chassis to the wall using screws or bolts suited to the wall.
Screws or bolts must be capable of supporting the heater weight when
filled.
Installation Procedures
COLD
INLET
VENT
OUTLET
INLET
POSITION
VENT
POSITION
Approximate Weight When Filled
100 mm
minimum
clearance
20 mm
minimum
clearance
from right
edge to wall
300 mm
150 mm
3.0 Litre models
12.5 kg
5.0 Litre models
16.5 kg
7.5 Litre models
20.5 kg
Installation Requirements