background image

Zenith Autoboil - Installation and Operating Instructions - 81433 - June 2012 v1.01 

Page3 of 12

Contents

Read These Warnings First ............................ 4

Installation Requirements .............................. 4

Installation Procedures .................................. 5

Step 1 – Positioning ............... 5

Step 2 – Fastening ................. 5

Step 3 – Connecting .............. 6

a) Plumbing ................6

b) Venting ...................6

c ) Electrical ...............6

Step 4 – Assembling .............. 6

Step 5 – Commissioning  ....... 6

Wall Mounting Template Dimensions 
& Electrical Diagram ...................................... 7

Problem Solving............................................. 8

Earthing Continuity Verification ...................... 8

Operating Procedures .................................... 9

Spare Parts .................................................... 10

Contact Details .............................................. 12

Note:

All plumbing must comply with AS3500.4.1 & AS3500.4.2

All electrical must comply with AS3350.1 & AS3350.2.15

Содержание Autoboil 01652

Страница 1: ...Instructions 81433 June 2012 v1 01 Page1 of 12 Installation and Operating Instructions Autoboil Instant boiling water 01652 Autoboil 1 5 Litre White 03652 Autoboil 3 0 Litre White 05652 Autoboil 5 0...

Страница 2: ...Page 2 of 12 Zenith Autoboil Installation Operating Instructions 81433 June 2012 v1 01 Intentionally left blank...

Страница 3: ...5 Step 2 Fastening 5 Step 3 Connecting 6 a Plumbing 6 b Venting 6 c Electrical 6 Step 4 Assembling 6 Step 5 Commissioning 6 Wall Mounting Template Dimensions Electrical Diagram 7 Problem Solving 8 Ea...

Страница 4: ...t use strong corrosive or abrasive cleaners to clean the case of the heater Frost protection If this heater is located where ambient air temperature could fall below 5 C when the heater is not in use...

Страница 5: ...aining board or drip tray Position the base of the tap to be not less than 200 mm above the draining board height should be increased only if essential for filling larger vessels Provide clearance for...

Страница 6: ...or concealed vent plumbing connect plumbing to the vent outlet from the heater rear using a capillary elbow protruding 45 mm from the wall Alternatively attach a tun dish to the wall as shown and plum...

Страница 7: ...ing Template Dimensions Electrical Diagram 1 5L 3 0 L 5 0 L 7 5 L 65 CLEAR 56 COLD INLET 72 15 25 35 42 POSITIONING PIN VENT EXTERNAL PLUMBING ELECTRICAL WIRING POSITION INTERNAL PLUMBING BENCH TOP 31...

Страница 8: ...th authorised agent Warning this appliance must be earthed Following remedial service the earthing continuity of the heater must be checked by a qualified technician using an appliance tester or conti...

Страница 9: ...ing water will flow until the tap handle is released This operation gives fingertip flow control for safe filling of cups and mugs To fill larger vessels such as teapots and saucepan s rotate the tap...

Страница 10: ...rload kit Autoboil 2000B 14 90501NZ Tap Top Kit Autoboil 2000B 15 90562NZ Tap Assy complete 2000B 16 90503NZ Strap and key kit 1 5 3L 2000B 16 90504NZ Strap and key kit 5 7 5L 2000B 17 90505NZ Tap nut...

Страница 11: ...Zenith Autoboil Installation and Operating Instructions 81433 June 2012 v1 01 Page11 of 12 Spare Parts...

Страница 12: ...tallation should it become necessary to service the appliance under the terms of Zenith Heaters Limited warranty To register your installation go to www zenithheaters co nz and look under the heading...

Отзывы: