Function check
5.1 Recovery
5.1.1 The working tank must have at least 2.5Kg of refrigerant in it to perform this test.
5.1.2 Plug in the cord to 220V 50HZ power supply, Turn ON the main power switch.
220V 50Hz Power supply must be firmly grounded
5.1.3 Confirm that the HP, LP quick coupler and hoses are well fixed to the units. And all
tank hoses are properly attached to the working tank.
5.1.4 Press
Function
button, and enter
Other Service
Item, use password 9227. Enter
the
M. control valve
interface.
Long press the
RECOVERY
button, check the output of the
main control board is CN2,CN4,CN8. That means the SV8/compressor, SV4/SV6, SV1/fan
are working. Or please check the circuit connection.
5.1.5 After check the output, If the station is not OK, Pressurize the high and low side
hoses with refrigerant by function recharge, long press the key
CHARGE
button.
5.1.6 Start the recovery by long pressing the
“R”
button for at least 30 seconds. Suction
will begin and the LP gauge will be pulled into -0.2bar vacuum at least. Or please check if
the flow routine blocked, The solenoid valve and the compressor are in health working state.
5.2 Vacuum
5.2.1 Confirm that the HP, LP quick coupler and hoses are well fixed to the units. And all
tank hoses are properly attached to the working tank.
5.2.2 Press
Function
button, and enter
Other Service
Item, use password 9227. Enter
the
M. control valve
interface.
Long press the
VACUUM
button, check the output of the
main control board is CN3,CN8. That means the SV1/fan, SV5/vacuum pump are working.
Or please check the circuit connection.
5.2.3 Start the vacuum by long pressing the
VACUUM
button for at least 20 seconds.
Suction will begin and the LP gauge will be pulled into -0.85bar vacuum at least. Or please
check if the flow routine blocked, the solenoid valve and the compressor are in health
working state.
Содержание AC1000-3G
Страница 1: ...ZELL ZELL MOBILE AIR CON SERVICE SOLUTION Mobile Air Con Service Solution AC1000 3G Service Manual...
Страница 5: ...4 3 Electronic diagram 3 1 Main power diagram 3 2 Main control board diagram...
Страница 6: ...5 4 Flow chart 4 1 Overall layout...
Страница 7: ...6 AC1000 3G BLOCK AND SOLENOID LAYOUT SV9 SV6 SV4 SV5 SV8 SV7 SV2 SV3 SV1...
Страница 8: ...7 4 2General flow chart 4 3 Recovery...
Страница 9: ...8 4 4Purge and drain oil 4 5 Vacuum...
Страница 10: ...9 4 6 PAG oil injection 4 7 Recharge...
Страница 11: ...10 4 8 Pressure up 4 9 Pressure down...