background image

3

3.

HEATLESS DRYER NOMENCLATURE

NOMINAL

FLOW

SCFM*

TYPE / DESIGN SERIES

ELECTRICAL POWER

OPTIONS

20

MPS

= Small Pressure Swing

1

= 115-1-60 (150 PSIG)

30

3

= 115-1-60 (300 PSIG)

40

A

= Pneumatic (150 PSIG)

60

B

= Pneumatic (300 PSIG)

0

= No Options

0

= NEMA 1 (-40°)

0

= Standard

0

= No Filter Pkg

B

= F + H

B

= NEMA 1 (-80°)

B

= S + M

V

= Filter Pkg A

F

= Fail-To-Shift

L

= NEMA 1 (-100°)

M

= Moisture Indicator

3

= Filter Pkg B

H

= High Humidity

H

= NEMA 4 (-40°)

P

= Adjustable Purge

6

= Filter Pkg C

M

= Moisture Load C F

K

= NEMA 4 (-100°)

Q

= P + M

7

= Filter Pkg D

N

= M + H

D

= NEMA 12 (-40°)

R

= Repress Line

5

= Filter Pkg E

V

= N.O. Inlet Valves

F

= NEMA 12 (-100°)

S

= Safety Relief Valves

4

= Filter Pkg F

9

= Filter Pkg A with Bypass

Nominal Flows indicated are for 100°F inlet air temperature, 100°F ambient temperature 

and 100 psig compressed air pressure.

Nomenclature shown above represents standard price sheet options. Other options are
available. Refer to nomenclature insert specific to your dryer for details. 

NOTICE

Содержание HYDRONIX 20MPS

Страница 1: ...shen Parkway West Chester PA 19380 Phone 610 692 9100 800 888 2323 Fax 610 692 9192 Web www zeks com NOTICE Those operating the machine or performing maintenamce should read and understand the decals...

Страница 2: ...R NOMENCLATURE 3 4 RECEIVING AND INSPECTION 4 5 SAFETY AND OPERATION PRECAUTIONS 5 6 PRINCIPLES OF OPERATION 6 7 INSTALLATION INITIAL START UP 9 8 SCHEDULED MAINTENANCE 13 9 TROUBLESHOOTING 16 10 SPAR...

Страница 3: ...BBREVIATED WARRANTY ZEKS Hydronix desiccant dryers are warranted to be free from defects in material and workmanship for a period of 12 months from the original date of shipment from the factory To al...

Страница 4: ...Pkg B H High Humidity H NEMA 4 40 P Adjustable Purge 6 Filter Pkg C M Moisture Load Control F K NEMA 4 100 Q P M 7 Filter Pkg D N M H D NEMA 12 40 R Repress Line 5 Filter Pkg E V N O Inlet Valves F N...

Страница 5: ...al Arrangement drawing for the appropriate means for lifting or moving the dryer For those dryers that indicate lifting via the structural skid forks should extend all the way through the skid to redu...

Страница 6: ...to observe and correct any unsafe operating conditions 5 NOTICE WARNING is used to indicate a hazardous situation which has some probability of death or severe injury Warning should not be considered...

Страница 7: ...t Flow Check Valve allows air flow through to the outlet connection of the dryer while The Left Outlet Flow Check Valve meters the purge air to the regenerating tower 6 3 REGENERATION CYCLE Previously...

Страница 8: ...alve is held closed so that the only source of air for regeneration passes through the purge adjustment assembly 6 6 VALVES Solenoid valves are electrically actuated valves used as the Inlet Flow Valv...

Страница 9: ...in one of the dryer switching valves The Fail to Shift Alarm uses a pressure switch to monitor the pressure in each tower The SST anticipates the appropriate open and closed switch position based on i...

Страница 10: ...ssed air lines to the inlet and outlet connections using piping and fittings suitable for the maximum pressure rating of the system Locate the prefilters as close as possible to the dryer Ensure the p...

Страница 11: ...possibility of desiccant dusting and carryover into the air system 7 5 ELECTRICAL CONNECTION Make all electrical connections to the dryer as shown on the wiring diagram Care must be taken in connectin...

Страница 12: ...secure the sensor cable to the sensor On dryers equipped with the Moisture Load Control Purge Saver option verify that the Purge Saver switch is in the off position to allow standard cycling at start...

Страница 13: ...alve to gradually pressurize the down stream piping On dryers equipped with Moisture Load Control the Purge Saver switch may be turned ON to save purge air as described in Section 6 11 When opening th...

Страница 14: ...higher muffler replace ment is recommended Section 8 4 Verify that prefilter and afterfilter differential pressure is within operating limits Change as required Section 8 2 SEMI ANNUAL MAINTENANCE FU...

Страница 15: ...t Check to verify that the solenoid is receiving electric current at appropriate times in the cycle Burned out solenoid coil High low voltage Voltage should be 10 of nameplate readings 8 4 Muffler Cha...

Страница 16: ...nt is packed into the towers which may interfere with the flow of the material from the towers Retainer screens located at the inlet and outlet piping connections of the tower are removable on all mod...

Страница 17: ...ction Clean purge piping and muffler Check pressure source and system for leakage Check flowrate and cause for increased demand Correct flowrate condition Check air compressor aftercooler clean and se...

Страница 18: ...ify Inlet Valve is closed to purging tower 0 psig tower Reset when right tower is on line PROBLEM Dryer fails to pressurize Dryer fails to purge Excessive back pressure in regener ating tower above 5...

Страница 19: ...80938 680938 680938 680938 FTS Pressure Switch 600924 600924 600924 600924 Green Light NEMA 1 680999 680999 680999 680999 Yellow Light NEMA 1 680998 680998 680998 680998 Red Light NEMA 1 680997 680997...

Отзывы: