background image

Exposed cabinet units will be 
furnished with an epoxy powder 
coated paint finish. Small scratches 
in the finish may be repaired with 
touch-up spray paint available from 
the factory.

Proper safety procedures should 
be followed regarding ventilation 
and personal safety equipment 
when using spray paint. Follow the 
manufacturer’s directions for the 
products being used.

To repaint the factory powder 
coat finish, prepare the surface 
by lightly sanding with #280 grit 
sand paper or #000 or #0000 fine 
steel wool. The surface may also 
be wiped with a liquid surface etch 
cleaning product. These items 
should be available at most paint 
product stores. It should be noted 
that the more care taken during 
this process, the more effective it 
will be.

Exposed unit touch-
up and repainting

After this preparation is finished, 
the factory finish should provide 
excellent adhesion for a variety 
of air dried top coats. Enamel will 
give a more durable, higher gloss 
finish, while latex will not adhere 
as well and will give a dull, softer 
finish. Top coats involving an 
exothermic chemical process 
between two components such 
as epoxies and urethanes should 
be avoided.

All standard colors including 
primer can be painted over. If the 
installing contractor chooses not 
to paint over the primer color, 
the factory cannot match primer 
color on future orders, potentially 
causing color match issues in the 
field.

Factory touch-up spray paint 
may require a number of light 
coats to isolate the factory finish 
from the quick drying touch-up 
paint.

23

Before proper control operation 
can be verified, all other systems 
must be operating properly. 
The correct water and air 
temperatures must be present 
to determine if the control 
function is operating to design. 
Some controls and features are 
designed to not operate under 
certain conditions. 

Controls operation

A wide range of controls, 
electrical options and 
accessories may be used 
with the units covered in this 
manual. Review the approved 
project submittals or order 
acknowledgment for detailed 
information regarding each 
individual unit and its controls. 
Since controls may vary from 
one unit to another, care should 
be taken to identify the controls 
being used with each individual 
unit and its proper control 
sequence. 

Start-up

Содержание RW-260

Страница 1: ...i Cooling Fresh Air Clean Air Heating Rittling Cabinet Unit Heater Installation Operation and Maintenance...

Страница 2: ...g 11 Safety considerations 12 Unpacking and preparation 13 Handling and installation 14 Hot water connections 15 Ductwork connections 16 Electrical connections 17 Wiring diagram 18 Start up 20 Air sys...

Страница 3: ...300 RW Wall RW 260 shown RW 270 and RW 280 available RWI Wall inverted flow RWI 290 shown RWI 300 and RWI 310 available RRW Wall partially recessed RRW 320 shown RRWI Wall partially recessed inverted...

Страница 4: ...I 240 RS 200 RSI 240 RF 220 RFI 250 RF Floor RF 200 shown RF 220 available RC Ceiling RC 360 shown RC 370 RC 380 RC 390 and RC 400 available RFI Floor inverted flow RFI 240 shown RFI 250 available RS...

Страница 5: ...Cu Blower Quantity 1 1 2 2 1 2 4 4 Diameter 5 7 5 7 5 7 5 7 5 7 5 7 5 7 Width 7 5 10 4 7 5 10 4 7 5 10 4 7 5 10 4 Filter Number 1 1 1 1 1 1 1 Length in 22 28 34 46 52 60 70 Width in 9 75 9 75 9 75 9...

Страница 6: ...0 Power input Watts 100 110 130 180 325 368 368 Voltage Volts 120 120 120 120 120 120 120 Hz 60 60 60 60 60 60 60 Phase 1 1 1 1 1 1 1 Table B Electrical ratings Notes Maximum circuit ampacity MCA 1 25...

Страница 7: ...2 3 1 2 5 1 4 4 1 2 8 1 8 RF 200 shown Dimensional data Unit size A B C D 02 38 3 16 22 3 16 24 20 03 44 3 16 28 3 16 30 26 04 50 3 16 34 3 16 36 32 06 62 3 16 46 3 16 48 44 08 68 3 16 52 3 16 54 50 1...

Страница 8: ...200 shown Dimensions and data Models RS and RSI Dimensional data Unit size A B C D 02 38 3 16 22 3 16 24 20 03 44 3 16 28 3 16 30 26 04 50 3 16 34 3 16 36 32 06 62 3 16 46 3 16 48 44 08 68 3 16 52 3...

Страница 9: ...rn and 1 row steam supply 1 row hot water suppy and 1 row steam return 2 row hot water return 2 row hot water supply 2 row hot water return 7 3 8 8 1 8 2 row hot water supply 7 1 4 4 1 2 24 24 18 1 4...

Страница 10: ...d 2 row coil supply and return 1 2 nominal 5 8 OD all sizes Unit shown with left hand piping connections and right hand electrical connections as standard Right hand piping connections with left hand...

Страница 11: ...3 44 3 16 28 3 8 30 18 5 8 04 50 3 16 34 3 8 36 23 5 8 06 62 3 16 46 3 8 48 23 5 8 08 68 3 16 52 3 8 54 33 5 8 10 76 3 16 60 3 8 62 33 5 8 12 86 3 16 70 3 8 72 33 5 8 Notes Damper motor always on righ...

Страница 12: ...ouvered inlet grille with internal bug screen 3 1 2 A Front View Weep holes 2 5 8 4 to 8 1 2 2 13 16 Side View Dimensions and data Outside air wall box Dimensional data Model A Rough opening WB 0203 2...

Страница 13: ...damage not discovered during unloading must be reported to the shipping company within 15 days of receipt of the shipment All units are shipped F O B factory Therefore Zehnder Rittling is not respons...

Страница 14: ...ys pressure test with an inert fluid such as water or dry nitrogen to avoid possible damage or injury in the event of a leak or component failure during testing Always protect adjacent flammable mater...

Страница 15: ...ve environments or in locations subject to temperature or humidity extremes e g attics garages rooftops etc Corrosive conditions and high temperature or humidity can significantly reduce system perfor...

Страница 16: ...ets where hanging rod and rubber in shear or spring vibration isolators supplied by others can be used for proper suspension and vibration isolation The type of mounting device is a matter of choice h...

Страница 17: ...sing a leak Secure the union nut hand tight and then tighten no more than an additional 1 4 turn The inlet supply connection is marked at the appropriate coil stub out with the other coil stub out bei...

Страница 18: ...vided with outside air should have some form of low temperature protection to prevent coil s from freezing This protection may be a low temperature thermostat to close the outside air damper a preheat...

Страница 19: ...gram Failure to do so could result in personal injury or damage to components and will void the manufacturer warranty All wiring connections should be checked prior to start up to ensure connections h...

Страница 20: ...LLOW WHITE YELLOW RED RED BLACK BLACK B R YEL WALL THERMOSTAT OPTIONAL RETURN AIR FAN CONTROL OPTIONAL AQUASTAT FAN CONTROL OPTIONAL R B WHITE BLACK GREEN WALL PLUG OPTIONAL DISCONNECT SWITCH OPTIONAL...

Страница 21: ...M BLOWER MOTOR MOTOR QUICK CONNECT OPTIONAL HEATER L1 T1 L2 T2 MANUAL MOTOR STARTER OPTIONAL TRANSFORMER L2 M2 FREEZESTAT OPTIONAL BLACK BLACK BLACK WHITE SEE CHART SEE CHART SEE CHART PSC MOTOR OPTI...

Страница 22: ...ancing The initial step is to visually inspect all of the equipment plenums connecting ductwork and piping Ensure that all systems are properly installed and supported and that all construction debris...

Страница 23: ...some systems may require repeated venting over time to fully eliminate air in the system Prior to the water system start up and balancing the hot water system should be thoroughly flushed to clean out...

Страница 24: ...xpert The system must be complete and all components must be in operating condition before beginning the water system balancing procedures Each hydronic system has different operating conditions depen...

Страница 25: ...p coats involving an exothermic chemical process between two components such as epoxies and urethanes should be avoided All standard colors including primer can be painted over If the installing contr...

Страница 26: ...increased power consumption Clean the coil at every inspection Units provided with the proper type of air filters replaced regularly will require less frequent coil cleaning Normal operation and peri...

Страница 27: ...d in the unit instead of being disposed of when dirty The cleanable filters may be washed in hot soapy water and then set aside to dry before recharging and reinstalling Before replacing the filter it...

Страница 28: ...undamaged Unit received complete as ordered Unit arrangement and handing is correct Unit structural support is complete and correct Handling and installation Mounting grommets isolators are used Unit...

Страница 29: ......

Страница 30: ......

Страница 31: ......

Страница 32: ...er Rittling 100 Rittling Boulevard Buffalo NY USA 14220 T 716 827 6510 F 716 827 6523 sales zehnder rittling com www zehnder rittling com Zehnder Rittling May 2014 English subject to change without no...

Отзывы: