Air system balancing

All ductwork must be complete and 
fully connected. All return and supply 
grilles, filters and access doors and 
panels must be properly installed 
before air balancing to ensure that 
the system is being balanced at the 
true system operating conditions.

Each individual unit and its attached 
ductwork is a unique system with 
its own operating characteristics.  
Because of this, air balancing is 
generally done by a trained balance 
specialist who is familiar with the 
procedures required to properly 
establish the fan system and air 
distribution operating conditions. 
This should not be attempted by 
unqualified personnel.

After proper system operation is 
established, the actual unit air 
delivery and the actual fan motor 
amperage draw for each unit should 
be measured and recorded for future 
reference.

Heating system

The air vents provided are not 
intended to replace the main 
system air vents and may not 
release air trapped in other parts 
of the system. Inspect the entire 
system for potential air traps and 
independently vent those areas 
as required. In addition, some 
systems may require repeated 
venting over time to fully 
eliminate air in the system.

Prior to the water system 
start-up and balancing, the 
hot water system should be 
thoroughly flushed to clean 
out dirt and debris which may 
have accumulated in the piping 
during construction. During this 
procedure, all unit service valves 
must be in the closed position. 
This will prevent any foreign 
material from entering the unit’s 
heat exchanger and clogging 
valves and metering devices. 
Strainers should be installed in 
the piping mains to prevent this 
material from entering the units 
during normal operation.

During system filling, air venting 
from the unit is accomplished by 
the use of the standard, manual 
air vent or the optional automatic 
air vent that is installed at the 
top of each coil’s header. Manual 
air vents are capped Schrader 
valves. To vent the air from the 
coil, unscrew the cap, turn the 
cap over and insert the pointed 
end of the cap into the vent to 
depress the valve until all of the 
air has been vented from the coil. 
When water begins to escape 
from the vent, release the valve 
and replace the cap. Automatic 
air vents may be unscrewed one 
turn counterclockwise to speed 
up the initial venting but should 
be screwed in for automatic 
venting during normal operation.

Start-up

Содержание RW-260

Страница 1: ...i Cooling Fresh Air Clean Air Heating Rittling Cabinet Unit Heater Installation Operation and Maintenance...

Страница 2: ...g 11 Safety considerations 12 Unpacking and preparation 13 Handling and installation 14 Hot water connections 15 Ductwork connections 16 Electrical connections 17 Wiring diagram 18 Start up 20 Air sys...

Страница 3: ...300 RW Wall RW 260 shown RW 270 and RW 280 available RWI Wall inverted flow RWI 290 shown RWI 300 and RWI 310 available RRW Wall partially recessed RRW 320 shown RRWI Wall partially recessed inverted...

Страница 4: ...I 240 RS 200 RSI 240 RF 220 RFI 250 RF Floor RF 200 shown RF 220 available RC Ceiling RC 360 shown RC 370 RC 380 RC 390 and RC 400 available RFI Floor inverted flow RFI 240 shown RFI 250 available RS...

Страница 5: ...Cu Blower Quantity 1 1 2 2 1 2 4 4 Diameter 5 7 5 7 5 7 5 7 5 7 5 7 5 7 Width 7 5 10 4 7 5 10 4 7 5 10 4 7 5 10 4 Filter Number 1 1 1 1 1 1 1 Length in 22 28 34 46 52 60 70 Width in 9 75 9 75 9 75 9...

Страница 6: ...0 Power input Watts 100 110 130 180 325 368 368 Voltage Volts 120 120 120 120 120 120 120 Hz 60 60 60 60 60 60 60 Phase 1 1 1 1 1 1 1 Table B Electrical ratings Notes Maximum circuit ampacity MCA 1 25...

Страница 7: ...2 3 1 2 5 1 4 4 1 2 8 1 8 RF 200 shown Dimensional data Unit size A B C D 02 38 3 16 22 3 16 24 20 03 44 3 16 28 3 16 30 26 04 50 3 16 34 3 16 36 32 06 62 3 16 46 3 16 48 44 08 68 3 16 52 3 16 54 50 1...

Страница 8: ...200 shown Dimensions and data Models RS and RSI Dimensional data Unit size A B C D 02 38 3 16 22 3 16 24 20 03 44 3 16 28 3 16 30 26 04 50 3 16 34 3 16 36 32 06 62 3 16 46 3 16 48 44 08 68 3 16 52 3...

Страница 9: ...rn and 1 row steam supply 1 row hot water suppy and 1 row steam return 2 row hot water return 2 row hot water supply 2 row hot water return 7 3 8 8 1 8 2 row hot water supply 7 1 4 4 1 2 24 24 18 1 4...

Страница 10: ...d 2 row coil supply and return 1 2 nominal 5 8 OD all sizes Unit shown with left hand piping connections and right hand electrical connections as standard Right hand piping connections with left hand...

Страница 11: ...3 44 3 16 28 3 8 30 18 5 8 04 50 3 16 34 3 8 36 23 5 8 06 62 3 16 46 3 8 48 23 5 8 08 68 3 16 52 3 8 54 33 5 8 10 76 3 16 60 3 8 62 33 5 8 12 86 3 16 70 3 8 72 33 5 8 Notes Damper motor always on righ...

Страница 12: ...ouvered inlet grille with internal bug screen 3 1 2 A Front View Weep holes 2 5 8 4 to 8 1 2 2 13 16 Side View Dimensions and data Outside air wall box Dimensional data Model A Rough opening WB 0203 2...

Страница 13: ...damage not discovered during unloading must be reported to the shipping company within 15 days of receipt of the shipment All units are shipped F O B factory Therefore Zehnder Rittling is not respons...

Страница 14: ...ys pressure test with an inert fluid such as water or dry nitrogen to avoid possible damage or injury in the event of a leak or component failure during testing Always protect adjacent flammable mater...

Страница 15: ...ve environments or in locations subject to temperature or humidity extremes e g attics garages rooftops etc Corrosive conditions and high temperature or humidity can significantly reduce system perfor...

Страница 16: ...ets where hanging rod and rubber in shear or spring vibration isolators supplied by others can be used for proper suspension and vibration isolation The type of mounting device is a matter of choice h...

Страница 17: ...sing a leak Secure the union nut hand tight and then tighten no more than an additional 1 4 turn The inlet supply connection is marked at the appropriate coil stub out with the other coil stub out bei...

Страница 18: ...vided with outside air should have some form of low temperature protection to prevent coil s from freezing This protection may be a low temperature thermostat to close the outside air damper a preheat...

Страница 19: ...gram Failure to do so could result in personal injury or damage to components and will void the manufacturer warranty All wiring connections should be checked prior to start up to ensure connections h...

Страница 20: ...LLOW WHITE YELLOW RED RED BLACK BLACK B R YEL WALL THERMOSTAT OPTIONAL RETURN AIR FAN CONTROL OPTIONAL AQUASTAT FAN CONTROL OPTIONAL R B WHITE BLACK GREEN WALL PLUG OPTIONAL DISCONNECT SWITCH OPTIONAL...

Страница 21: ...M BLOWER MOTOR MOTOR QUICK CONNECT OPTIONAL HEATER L1 T1 L2 T2 MANUAL MOTOR STARTER OPTIONAL TRANSFORMER L2 M2 FREEZESTAT OPTIONAL BLACK BLACK BLACK WHITE SEE CHART SEE CHART SEE CHART PSC MOTOR OPTI...

Страница 22: ...ancing The initial step is to visually inspect all of the equipment plenums connecting ductwork and piping Ensure that all systems are properly installed and supported and that all construction debris...

Страница 23: ...some systems may require repeated venting over time to fully eliminate air in the system Prior to the water system start up and balancing the hot water system should be thoroughly flushed to clean out...

Страница 24: ...xpert The system must be complete and all components must be in operating condition before beginning the water system balancing procedures Each hydronic system has different operating conditions depen...

Страница 25: ...p coats involving an exothermic chemical process between two components such as epoxies and urethanes should be avoided All standard colors including primer can be painted over If the installing contr...

Страница 26: ...increased power consumption Clean the coil at every inspection Units provided with the proper type of air filters replaced regularly will require less frequent coil cleaning Normal operation and peri...

Страница 27: ...d in the unit instead of being disposed of when dirty The cleanable filters may be washed in hot soapy water and then set aside to dry before recharging and reinstalling Before replacing the filter it...

Страница 28: ...undamaged Unit received complete as ordered Unit arrangement and handing is correct Unit structural support is complete and correct Handling and installation Mounting grommets isolators are used Unit...

Страница 29: ......

Страница 30: ......

Страница 31: ......

Страница 32: ...er Rittling 100 Rittling Boulevard Buffalo NY USA 14220 T 716 827 6510 F 716 827 6523 sales zehnder rittling com www zehnder rittling com Zehnder Rittling May 2014 English subject to change without no...

Отзывы: