31
Equipment start-up
checklist
Receiving and inspection
n
n
Unit received undamaged
n
n
Unit received complete as
ordered
n
n
Unit arrangement and handing
is correct
n
n
Unit structural support is
complete and correct
Handling and installation
n
n
Unit mounted level and square
n
n
Proper access is provided for
unit and accessories
n
n
Proper chilled/hot water line
sizes to unit
n
n
All services to unit in code
compliance
n
n
Unit protected from dirt and
foreign matter
Cooling/heating connections
n
n
Connect field piping to unit
n
n
Pressure test all piping for leaks
n
n
Install drain lines and traps, as
required
n
n
Insulate all piping, as required
Ductwork connections
n
n
Install ductwork, fittings and
grilles, as required
n
n
Flexible duct connections at unit
n
n
Proper supply and return grille type
and size
n
n
Control outside air for freeze
protection
n
n
Insulate all ductwork, as required
Unit start-up
n
n
General visual inspection and
system inspection
n
n
Close all unit isolation valves
n
n
Flush water systems
n
n
After system has been flushed,
ensure all isolation valves are
open