Unpacking and preparation

All units are carefully inspected 
at the factory throughout the 
entire fabrication and assembly 
processes under Zehnder 
Rittling’s stringent quality 
assurance program. All major 
components and subassemblies 
such as coils, drain pans, 
nozzles and sealed edges are 
carefully tested for proper 
operation, visually inspected and 
verified for full compliance with 
factory standards. 

Induction Units are usually 
shipped on pallets of up to 10 
units (24", 32") or 5 units (40", 
52"). Each unit is factory tagged 
according to the customer’s 
purchase order. This allows the 
unit, upon removal from the 
pallet, to be taken directly to its’ 
assigned space for immediate 
installation. Units should not be 
installed at locations other than 
that designated on the tag.

Each unit is placed in a 
cardboard container for 
shipment to avoid damage 
during normal handling in the 
shipment process. It is the sole 
responsibility of the customer 
to provide the protection 
necessary to prevent vandalism 
and weather deterioration 
of the equipment. Under no 
condition should the units be left 
unprotected from the elements. 
If the equipment is not needed 
immediately at the job site, it 
should be left in its shipping 
carton and stored in a clean, 
dry area of the building or in a 
warehouse. Do not remove any 
equipment from its shipping 
package until it is needed for 
installation. The equipment 
is NOT suitable for outdoor 
installations.

DO NOT store or install units 
in corrosive environments or in 
locations subject to temperature 
or humidity extremes (e.g., 
attics, garages, rooftops, etc.). 
Corrosive conditions and high 
temperature or humidity can 
significantly reduce system 
performance, reliability and 
overall service life.

After determining the condition of 
the cardboard container exterior, 
carefully remove each unit from the 
container and inspect for hidden 
damage. At this time, check that 
all shipped loose items such as lint 
screens, wall mounting strips, air 
transition fittings, etc. are accounted 
for and placed in a safe area. Any 
hidden damage should be recorded 
and immediately reported to the 
carrier and a claim should be filed. 
In the event a claim for shipping 
damage is filed, the unit, cardboard 
container, and all packing must be 
kept for physical inspection by the 
freight carrier.

Once the equipment is properly 
positioned on the job site, cover 
the units with either a shipping 
carton, vinyl film, or an equivalent 
protective covering. Cap open ends 
of piping that is stored on a job site. 
Take special care to prevent foreign 
materials from entering the units in 
areas where painting, dry walling, 
or spraying of fireproof material, 
etc. has not yet been completed as 
these materials may accumulate in 
the drain pan or on the coils. Foreign 
material that accumulates within 
the units can prevent proper start-
up, necessitate costly clean-up 
operations, or result in immediate 
or premature component failure. 
Before installing any of the system 
components, be sure to examine 
each pipe, fitting and valve, and 
remove any dirt or foreign material 
found in or on these components. All 
manufacturer’s warranties are void 
if foreign material is allowed to be 
deposited in the drain pan or on the 
coil of any unit. Some job conditions 
may require some form of temporary 
unit covering during construction.

23

Unpacking and preparation

Содержание HC

Страница 1: ...i Cooling Fresh Air Clean Air Heating Induction Unit Installation Operation and Maintenance...

Страница 2: ...hilled hot water connections 25 Ductwork connections 26 Start up 26 Air system balancing 27 Cooling heating system 27 Water system balancing 28 Water treatment 28 Normal operation maintenance 29 Repla...

Страница 3: ...ow applications to counteract downdrafts during the heating season Horizontal units are the best choice where the use of full length draperies is desirable and heating requirements are not too severe...

Страница 4: ...covery stack high capacity coil 2 pipe system Model VW Vertical wall 2 pipe system Model VH Vertical wall with heat recovery stack 2 pipe system Model V4H Vertical wall with heat recovery stack 4 pipe...

Страница 5: ...1 63 5385 0 87 3743 2 74 4238 1 62 4656 1 07 90 1942 6515 3 72 5563 3 14 5966 1 82 4684 2 88 5060 1 83 5557 1 09 3855 3 08 4364 1 82 4794 1 20 5279 0 69 95 2055 5751 3 50 6168 2 03 4825 3 21 5213 2 04...

Страница 6: ...892 0 68 3503 1 75 3970 1 07 4289 0 68 3328 1 15 60 1296 6004 3 24 5179 2 85 5489 1 65 4048 3 57 4469 2 11 4812 1 39 5162 0 81 3674 2 09 4164 1 28 4499 0 81 3479 1 36 3939 0 81 65 1405 5470 3 34 5797...

Страница 7: ...1 65 5343 3 57 5899 2 11 6353 1 39 6813 0 81 4729 2 09 5360 1 28 5791 0 81 4363 1 36 4939 0 81 65 1405 8981 3 80 7400 3 34 7844 1 94 6197 2 48 6674 1 63 7158 0 95 4941 2 45 5601 1 50 6051 0 95 4546 1...

Страница 8: ...5 1 75 3916 1 07 4231 0 68 3038 1 15 60 1296 7230 3 24 5861 2 85 6212 1 65 4300 3 57 4746 2 11 5111 1 39 5482 0 81 3625 2 09 4108 1 28 4439 0 81 3177 1 36 3596 0 81 65 1405 7812 3 80 6190 3 34 6562 1...

Страница 9: ...687 1 15 60 1296 5926 3 24 4883 2 85 5176 1 65 3643 3 57 4022 2 11 4335 1 39 4646 0 81 3152 2 09 3573 1 28 3861 0 81 2809 1 36 3181 0 81 65 1405 6396 3 80 5158 3 34 5467 1 94 4226 2 48 4559 1 63 4881...

Страница 10: ...68 2995 1 15 60 1296 5403 3 24 4661 2 85 4940 1 65 3643 3 57 4022 2 11 4331 1 39 4645 0 81 3307 2 09 3748 1 28 4049 0 81 3131 1 36 3545 0 81 65 1405 5832 3 80 4923 3 34 5217 1 94 4225 2 48 4550 1 63 4...

Страница 11: ...07 4808 0 68 3574 1 15 60 1296 7691 3 24 6370 2 85 6752 1 65 4777 3 57 5273 2 11 5679 1 39 6091 0 81 4119 2 09 4668 1 28 5044 0 81 3737 1 36 4230 0 81 65 1405 8301 3 80 6728 3 34 7131 1 94 5540 2 48...

Страница 12: ...5 5626 1 65 4048 3 57 4469 2 11 4812 1 39 5162 0 81 3582 2 09 4060 1 28 4387 0 81 3305 1 36 3742 0 81 65 1405 6804 3 80 5606 3 34 5942 1 94 4695 2 48 5056 1 63 5423 0 95 3743 2 45 4243 1 50 4584 0 95...

Страница 13: ...68 3328 1 15 60 1296 6004 3 24 5179 2 85 5489 1 65 4048 3 57 4469 2 11 4812 1 39 5162 0 81 3674 2 09 4164 1 28 4499 0 81 3479 1 36 3939 0 81 65 1405 5470 3 34 5797 1 94 4695 2 48 5056 1 63 5423 0 95...

Страница 14: ...onnection Four inch minimum distance from wall required to obtain rated capacity 8 1 2 minimum for screen removal Shipping weight includes packaging Description The H4C is shipped from the factory wit...

Страница 15: ...l connection Four inch minimum distance from wall required to obtain rate capacity 8 1 2 minimum for screen removal Shipping weight includes packaging Description The HC is shipped from the factory wi...

Страница 16: ...ng weight includes packaging Description The V2H is shipped from the factory with the following Acoustically designed plenum and nozzles as specified One 12 tube coil with copper tubes and aluminum fi...

Страница 17: ...ections to be determined Inner coil is always for cooling and determines whether it is RH or LH connections Heating coil connections are opposite of cooling connections Description The V4H shipped fro...

Страница 18: ...ation of coil connections to be determined Inner coil is always for cooling and determines whether it is RH or LH connections Heating coil connections are opposite of cooling connections Description T...

Страница 19: ...rientation of coil conenctions to be determined Inner coil is always for cooling and determines whether it is RH or LH connections Heating coil connections are opposite of cooling connections Descript...

Страница 20: ...ludes packaging Description The VH is shipped from the factory with the following Acoustically designed plenum and nozzles as specified One 6 tube coil with copper tubes and aluminum fins Condensate p...

Страница 21: ...onnection mounted same side as coil connection Shipping weight includes packaging Description The VL is shipped from the factory with the following Acoustically designed plenum and nozzles as specifie...

Страница 22: ...nection Shipping weight includes packaging Description The VW is shipped from the factory with the following Acoustically designed plenum and nozzles as specified One 6 tube coil with copper tubes and...

Страница 23: ...ccepted without written authorization from Zehnder Rittling A unit that has received a written Return Goods Authorization will be inspected by Zehnder Rittling upon receipt Any damage missing parts re...

Страница 24: ...working on any mechanical equipment Gloves should always be worn for protection against heat sharp edges and all other possible hazards Safety glasses should always be worn especially when drilling c...

Страница 25: ...rooftops etc Corrosive conditions and high temperature or humidity can significantly reduce system performance reliability and overall service life After determining the condition of the cardboard co...

Страница 26: ...ricated with heavy gauge materials and may present a robust appearance great care must be taken to assure that no undue force is applied to the coil piping drain connection or other delicate component...

Страница 27: ...pan drip pan or alternatively is eliminated through the use of insulation After the connections are completed the system should be tested for leaks Since some components are not designed to hold pres...

Страница 28: ...d on all air handling equipment to minimize vibration transmissions Insulation and ductwork should be installed to allow servicing of equipment including motors blowers filters etc Zehnder Rittling as...

Страница 29: ...ach unit To adjust the damper push or pull the handle located at position 4 Replace the plug to seal the primary air commissioning sampling tube on completion After proper system operation is establis...

Страница 30: ...bleed air from the pipe system during the commissioning state A flat head screw driver can be used to loosen the vent screw After the proper system operation is established the appropriate operating c...

Страница 31: ...r Remove the 2 sheet metal screws fastening condensate pan to unit Remove the 4 sheet metal screws fastening coil to unit and remove coil Install new coil in reverse Lint screens These types of filter...

Страница 32: ...conditions Check primary airflow nozzle pressure primary air tempera ture and secondary water temperature Correct to design conditions Replacement parts Foreign object in unit Vacuum unit to remove de...

Страница 33: ...dirt and foreign matter Cooling heating connections n n Connect field piping to unit n n Pressure test all piping for leaks n n Install drain lines and traps as required n n Insulate all piping as req...

Страница 34: ......

Страница 35: ......

Страница 36: ...ing 100 Rittling Boulevard Buffalo NY USA 14220 T 844 934 6337 844 ZEHNDER F 716 827 6523 sales zehnder rittling com www zehnder rittling com Zehnder Rittling October 2014 English subject to change wi...

Отзывы: