12 - EN
EN - 13
3 Commissioning procedure
3.1 Commissioning the unit
Zehnder recommends cleaning the air ducts before commissioning the unit if the dwelling is occupied. This will
prevent damage to the furniture from building dust being blown out of the air ducts.
1
2
3
Connect the power to the unit.
Run the first part (basic
configuration) of the
commissioning wizard
immediately after turning on
the power. These settings are
necessary to protect the unit
from frost and water damage.
Open the semi-transparent visor.
The unit will automatically start up the
commissioning wizard.
Follow the instructions on the display.
4
Example ancillaries
5
6
Example report
Commission all connected ancillaries
as instructed in their manual.
The commission procedure for
the RF ancillaries is different
from the older Zehnder units.
Please help the user by also setting
the advanced user menus for them.
Like for instance the settings for
the control of the sensors and
temperature comfort.
In the user manual you can find how to
set the advanced menus.
Fill in the installation/test report in the
back of the user manual.