3.0 On-Site Commissioning
3.1.1 This section covers set-up, configuration of the unit for installation and altering pre-set factory settings. For
instructions on how to operate the LCD display user menu, maintenance options and indicator warning
information, please refer to the User / Homeowner Guide.
3.1.2 Once the wiring connections have been checked, switch the mains supply on and check that the system is
operating correctly. Lift cover of commissioning wizard located at the top of the unit. Upon connection of
electrical supply, the commissioning wizard will automatically turn on
(See Section 3.1.4).
3.1.3
Overview of Integral LCD Display
P
O R T
C O N F I G :
< R H >
Example 1:
Function selection screen
Top line - function / statement.
Bottom line - flashing cursor indicating next
action to be reviewed/changed.
P O R T
C O N F I G :
< R H >
>
d
w
f
>
c k
a
b
Example 2:
Re-confirmation screen
Top line - function / statement.
Bottom line - three selectable functions
always come into screen with fwd flashing.
Option to move forward towards completion or
back to re-set function.
S E T U P
C O M P L E T E
>
i t
x
e
>
c k
a
b
Example 3:
No editable variable in middle only ever seen as last step in the wizard
Top line - function / statement.
Bottom line - two selectable functions
only found at the end of the wizard.
Selection of exit will confirm all wizard
configuration settings.
Frost
Protection
LED
Service/Fault
LED
Summer
ByPass
LED
Control Information Panel
Control
Button
# Meaning
A Control Information Panel
B Control Button
C Summer ByPass LED
D Frost Protection LED
E Service/Fault LED
A
C
B
D
E
Below are examples/explanations of what you would see through the
Commissioning Wizard.