Concept House
Watchmoor Point
Camberley
Surrey GU15 3AD
Tel:
Fax: 01276 24058
[email protected]
www.zehnder.co.uk
Registered in England: 2296696
01276 605800
Zehnder Group UK Ltd
Issue 1.0
Issue 1.0
Key
Component
Qty
Tools & Material Required
C
B
A
D
E
A
Wall Plug
4
B
Bracket
4
C
Screw - Rnd Head, 6mm dia x 50mm
4
D
Grub Screw
4
E
Allen Key
1
Tape measure
Screwdriver - crosshead
Screwdriver - flathead
Electric drill
Masonry drill bit - 8mm diameter
Spirit level
Stepladder (for taller radiators)
Assembly Instructions
Accurately mark out bracket holes on wall using spirit level.
Drill four 8mm diameter holes to a minimum depth of 60mm &
insert wall plugs (A).
Screw brackets (B) into wall plugs (A) with 6mm diameter x 50mm
screws (D).
Slide boss on radiator into bracket (B) and secure in position by
tightening grub screw (D) with allen key (E).
Electric radiators should be fitted only by a qualified electrician
and must be earthed and connected to a cable outlet in the
bathroom in accordance with I.E.E. wiring regulations. The
electrical connection should be made to a ‘5 amp fused fixed spur’
located outside the bathroom.
Note: for maintenance purposes, cable outlets must remain
accessible and cables must not be buried directly into walls.
Zehnder Alban Electric