7
HOLD DOWN BRACKETS (OPTIONAL)
Lower the shading, keeping the vanes closed.
Place the magnetic hold down bracket onto the
bottom rail just inside the end cap, oriented as shown.
Hold the bracket while opening and closing the vanes
(it may be necessary to have someone assist you).
Adjust the bracket to the best overall position.
Attach the hold down brackets to the mounting
surface using the screws provided.
If necessary, adjust bracket height by loosening the
screw and sliding the bracket up or down.
OUTSIDE
MOUNT
INSIDE
MOUNT
Preferred
Preferred
Alternate
Alternate
Mark the screw location using the mounting options
shown to the right.
The screw should be placed in the middle of the slot.
This will allow for adjustment.
Drill the screw holes using a
3
⁄
32
”
drill bit.
IMPORTANT: Use drywall anchors when mounting
into drywall.
If the fabric is moving to one side as the shading is raised
(skewing), first check that the installation brackets are level.
Shim to level, if necessary. If the brackets are level it may be
necessary to adjust the bottom rail weight.
To release the weight clip, insert a flat blade screwdriver into
the weight clip and turn clockwise.
Move the weight in 1” increments toward the side where the
fabric is gathering.
Secure the weight clips in position by turning them
counterclockwise after making the adjustment.
Test and, if necessary, adjust again.
Release
SKEW ADJUSTMENT (IF NECESSARY)