Press the “↓” key once from the main menu to access the instantaneous
information on the battery and AC grid.
Press the “↑” key once from the main menu to access the
instantaneous information on the DC side of the inverter.
6. OPERATING STATES IN AUTOMATIC MODE
5. QUICK INFO ON SYSTEM STATUS
The 3000SP will remain in Standby until:
•
the difference between the PV production and the
power required by the loads is less than 100W
•
the battery is fully charged and the PV production
is higher than the consumption (with tolerance of
100W)
•
the battery is flat and the PV production is lower
than the consumption (with tolerance of 100W)
When the power produced from the photovoltaic
system is greater than the energy required by the
loads, the 3000SP inverter will charge the battery with
the excess energy.
When the battery is fully charged, or when the
charging power is limited (to preserve the integrity of
the battery), the excess energy will be exported to
the grid.
Charge
When the power of the photovoltaic system is once
again less than the power required by the loads, the
system will use the energy stored in the battery to
power the domestic utilities.
Discharge
When the sum of the power produced by the
photovoltaic system and supplied by the battery is
less than that required by the loads, the missing
energy will be taken from the grid.
Standby
Standby
Standby
Charge
Charge
Discharge
Discharge