ZCS Azzurro HYD 3000 ES Скачать руководство пользователя страница 19

CHANGE-OVER SWITCH 

In case of maintenance of the components of the photovoltaic system or in case of an inverter that cannot be used, 
it is recommended to install a change-over switch so that the loads normally connected to the inverter's load line 
can be fed directly from the grid. 

 

DOUBLE SWITCH CONTACTOR 

For subsidised systems, a double switch contactor can be installed. This device will ensure that the critical loads 
are normally powered by the grid, they will be powered by the EPS LOAD line of the inverter only in the event of a 
power failure thanks to the change-over of the contactors 

230V 

230V 

If the alternating voltage supplied by the grid is present 

(normal operating condition), both the standard loads of 

the system and the priority or critical loads are supplied by the grid without the need to use a double switch-over 
contactor. This operation is shown in the figure below.

  

It should also be 
noted that the 
LOAD output is 
always energised, 
even when the 
mains voltage is 
present. 

Position 1

→ Priority loads connected and 

powered by the inverter's LOAD line 
 

Position 0

→ Priority loads not powered by 

the inverter or by the grid 

 
Position 2

→ Priority loads connected and 

powered by the grid  

19.4

 

EPS MODE (OFF GRID) - OPERATION 

Double 

switch 

contactor 

CHANGE-OVER 

SWITCH 

CRITICAL LOADS 

GRID AND 
UTILITIES 

 

Note: 

If the hybrid inverter is to be installed under different conditions from those shown in the diagrams above, 

contact technical support to check whether it is feasible. 

NOTE: 

For the conditions described above, in the event of a power failure, the part of the system powered by 

the inverter's LOAD port behaves like an IT system 

Critical 

Loads 

LOAD 

GRID 

Содержание Azzurro HYD 3000 ES

Страница 1: ...QUICK INSTALLATION GUIDE HYBRID INVERTER ...

Страница 2: ...BRID STORAGE INVERTER 1 INSTALLATION AND DISTANCES Note If the hybrid inverter is to be installed under different conditions from those shown in the diagrams above contact technical support to check whether it is feasible 20 20 Distances for the installation of a single inverter Distances for the installation of multiple inverters Monitoring Always wear protective clothing and or personal protecti...

Страница 3: ...gs 1 Battery parameters 2 Clear Energy Data 3 Clear Events 4 Set Country Code 5 Zero grid feed in mode 6 IV Curve Scan 7 Battery active 8 Logic interface 9 CT Direction 3 Event list 1 List of current events 2 List of historical events 4 System Info 1 Inverter Info 2 Battery Info 3 Safety parameters 6 Energy Statistics Today Week Month Year Life Cycle PV prod PV prod PV prod PV prod PV prod AutoCon...

Страница 4: ...ion with tolerance of 100W When the power produced from the photovoltaic system is greater than the energy required by the loads the 3000SP inverter will charge the battery with the excess energy When the battery is fully charged or when the charging power is limited to preserve the integrity of the battery the excess energy will be exported to the grid Charge When the power of the photovoltaic sy...

Страница 5: ... screws then tighten the cable glands Note The communication cable is located inside the kit in the inverter box Communication cable pinout between Pylontech battery and hybrid left to right PIN 1 White orange PIN 2 orange PIN 3 white blue PIN 4 blue PIN 1 not used PIN 2 not used PIN 3 not used PIN 4 White orange PIN 5 orange PIN 6 not used PIN 7 white blue PIN 8 blue 1 4 Hybrid Pylontech 1 8 Note...

Страница 6: ...ositive 3 1 Battery connection Note To connect multiple batteries in parallel use the appropriate cables power and connection contained in the kit Note The DIP switch positions must be set according to the factory settings When connecting multiple batteries in parallel connect the communication cable previously connected to the inverter s CAN port to the CAN port of one of the batteries This will ...

Страница 7: ...t of the Slave 1 battery NOTE do not connect the RS485 A port to the Master battery In case of additional batteries the communication cable will be connected as indicated above for the connection of the MASTER battery to SLAVE 1 The last battery will only have the RS485 A port connected As for the power connections all the batteries must be connected in parallel using the power cables supplied mak...

Страница 8: ...MASTER SLAVE 2 SLAVE 1 MASTER SLAVE MASTER SLAVE 2 SLAVE 1 SLAVE 3 MASTER SLAVE 2 SLAVE 1 SLAVE 3 SLAVE 4 Connecting 5 batteries Connecting 4 batteries Connecting 3 batteries Connecting 2 batteries ...

Страница 9: ...r Route the CT cable through the cable glands on the right side of the cover connect the positive and negative cables of the sensor to the counterpart contained in the inverter kit then insert the counterpart into the corresponding port on the inverter board OK HYBRID CT Protection switch NO PV panels HYBRID PV panels For the extension cable it is recommended to use a category five 8 pole mains ca...

Страница 10: ...the cable gland C and connect the phase neutral and ground cables to the GRID terminal block NOTE The loads connected to the LOAD output will be regularly powered even in the presence of the AC grid 10 CONNECTING TO THE GRID The sensor must include all phase cables entering or leaving the meter HYBRID PV panels Protection switch Protection switch Meter Critical Loads Utilities Batteries ...

Страница 11: ... configurator In addition check that the polarities of the photovoltaic cables are correct Insert the positive and negative connectors of the HYD ES inverter until you hear a click Use a MC4 wrench to disconnect the photovoltaic connectors NOTE Both MPPT inputs of the inverter should be populated even if the system only has one string Use a Y cable or a square to split the string Configure the inv...

Страница 12: ...Current flow Loads Import Export meter Turn on the batteries In case of WeCo batteries press the POWER button of each battery for 1 second the RUN LED will turn on and the internal contactor will close automatically To turn on the Pylontech batteries bring the switch on the front of all the batteries to the ON position Press the red SW button of a single battery for one second the internal contact...

Страница 13: ...LTAIC START UP Direction of power flow IMPORT from grid to utility EXPORT from utility to grid Phase shift between the voltage V and current I expressed as a percentage P V x I cosϕ Indicates the status of the current sensors UNFREEZE direction not blocked at each system start the direction depends on the direction of the first current flow FREEZE direction blocked sensors keep the same direction ...

Страница 14: ...et Country 1 Country 2 Enable Country Change 4 3 Initial settings Battery 1 Advanced settings 1 Battery parameters 1 Battery type 2 Depth of Discharge 3 Save Password 0001 1 PYLON PYLONTECH 4 GENERAL LITHIUM WECO Depth of discharge 50 EPS depth of discharge 80 Safety Buffer 10 After setting the parameters confirm by moving the cursor to Save and press Select the code corresponding to the national ...

Страница 15: ...splay is approximately equal to the power consumption shown on the meter or to the value obtained by using a current meter to measure under the import export meter Hybrid Inverter OFF GRID ON NA NA OFF 1 2 16 CHECKING FOR CORRECT OPERATION 2 Restore AC voltage by flicking the dedicated switch upwards Battery Hybrid Inverter GRID OFF Battery ON ...

Страница 16: ...t met Unfreeze the current sensors as described in point 12 2 of this guide Check the correct positioning of the current sensors and then restart the system by performing the above checks and freeze the sensors only after making sure that everything has been installed correctly Once the countdown is over the batteries will start to deliver power to the utility according to availability and will at...

Страница 17: ...Battery Info 1 Battery type Pylon Battery capacity Depth of Discharge 50Ah 80 BMS 25 00A SET 65 00A Curr Max charge current A Battery Info 1 Battery type WeCoHeSU V0 3 54 Battery capacity Depth of Discharge 86Ah 90 BMS 65 00A SET 65 00A Curr Max charge current A Battery Info 2 Overvoltage threshold 54 0V Max charge threshold V 53 2V Max discharge current A BMS 25 00A SET 65 00A Battery Info 2 Over...

Страница 18: ...th high inrush currents such as pumps compressors or in general devices driven by electric motors may not be supported by the inverter in EPS mode as the inrush current even if only for a very short period is considerably higher than that supplied by the inverter Inductive loads such as induction plates may not be supported by the inverter in EPS mode due to the waveform of these devices Identify ...

Страница 19: ... the priority or critical loads are supplied by the grid without the need to use a double switch over contactor This operation is shown in the figure below It should also be noted that the LOAD output is always energised even when the mains voltage is present Position 1 Priority loads connected and powered by the inverter s LOAD line Position 0 Priority loads not powered by the inverter or by the ...

Страница 20: ...A 1 100 W System with two Pylontech batteries 10 A 2 200 W System with three or more Pylontech batteries 13 A 3 000 W System with one or more WECO batteries 13 A 3 000 W In the event of a blackout the alternating voltage supplied by the grid will be lost this condition will cause the internal contacts of the hybrid inverter to switch over which once the set activation time has expired will continu...

Страница 21: ...ds in EPS or OFF Grid mode once the set threshold has been exceeded SOC 100 Depth of Discharge in EPS safety buffer e g LOAD output re supplying value 26 7 1 Check inverter settings If the photovoltaic production is normal but the LOAD consumption 0 or if the SOC 100 EPSDOD the excess energy will be stored in the battery If PV production LOAD consumption ΔP 100W the HYD ES inverter will charge the...

Страница 22: ...he batteries Switch on the photovoltaic system by turning the switch to the ON position 3 ON In case of WeCo batteries press the POWER button of each battery for 1 second the RUN LED will turn on and the internal contactor will close automatically To turn on the Pylontech batteries bring the switch on the front of all the batteries to the ON position Press the red SW button of a single battery for...

Страница 23: ...e has been set 1 Settings 11 Self test 1 Fast self test 2 STD self test 22 SELF TEST 21 OPERATION OF PHOTOVOLTAIC SYSTEM ONLY The system can also work as a photovoltaic inverter only and therefore without batteries In this case the display will only show the values relating to Photovoltaic production Load consumption Power exchanged with the grid NOTE In this case the AC wire must be connected to ...

Страница 24: ...23 DATASHEET ...

Отзывы: