background image

Operator Parameters

SET

°C

AUTO

°C

AUTO

°C

AUTO

°C

AUTO

°C

AUTO

°C

AUTO

°C

AUTO

°C

AUTO

°C

AUTO

°C

AUTO

SET

SET

SET

SET

SET

SET

SET

SET

SET

°C

AUTO

SET

Current transformer ratio for Module-1 
can be adjusted from 0 to 100.)
e g

:  

F o r   1 0 0 : 5 A   t y p e   c u r r e n t  

transformer the Ctr 1 parameter would 
be 100/5 or 20

Current Transformer

Calculating set value for heater failure

Set Value = [(Current value without f 
Current value with heater failure )] / 2
eg.  A  200V  system  with  three1KW  heaters 
would normally draw 15 amps
[1000 / 200 ]*3 = 5A *3 = 15A
If one of the heaters is out of order, the current 
draw is now 5A*2 or 10A. The Set Value must 
be adjusted to (15+10) /2 or12.5A

HEATER BREAK ALARM

to Module 1

PNEUMONIC REPRESENTATION

 1-877-798-7287

P.7

MOTORIZED VALVE CONTROL

SET

°C

AUTO

°C

AUTO

°C

AUTO

AUTO

SET

SET

SET

°C

ESM 7750 v10R7

°C

AUTO

°C

AUTO

SET

°C

AUTO

SET

°C

AUTO

SET

°C

SET

°C

AUTO

SET

°C

SET

°C

SET

process
set
value

alarm 1
set
value

alarm 2
set
value

alarm 3
set
value

tune

auto
tune

Operation
type

ramp/soak
control

motorized
valve
control

bumpless
transfer

alarm
latch
cancelling

top
display

bottom
display

soft
start

ramp/
soak
tolerance

ramp/
soak
steps

PU=RS nbr.

tr=ramp time

tS=soak time

up to 8 R/S
steps

Ramp/Soak

menu

EMO-700  relay  output 
module must be plugged 
into Module-1 socket.

100 ... 240 V

Opening 

Relay

N

L

Supply
Switch

Closing

Common

Opening

Valve
Supply
Input

~

M

~

~

V

n n

Ope i g Closing

MOTORIZED VALVE

50/60 Hz

1A    T

Fuse

~

Max. 3A     T 

Fuse

~

10

Input/Output

Module-2

MODULE-2

Output-3

Closing

Relay

1

11

2

13

3

14

4

17

5

18

6

NO

C

3A@250V

NO

C

5A@250V

EMO-700

MODULE-1

~

~

Communication
Module
(RS-232(standard)/
RS-485(optional))

7

NC

Control Output

200V

1kW*3

Heater

~

10

11

CT

MODULE-1

In the RUN LIST grouping of the 
OPERATOR’s section, select HEAT or 
COOL for parameter ULSL.
The                parameter can be adjusted 
from 5 to 600 seconds. It defines the time 
required to open the valve completely.To 
determe this parameter correctly, close the 
valve manually. Be sure the valve is fully 
closed; then reopen it manually without 
stopping and measure how long it took to 
reopen it completely. Add 5% to this value 
and enter it for this parameter.
The                parameter  determines the 
increments as a percentage of the Ultt 
parameter  and can be adjusted from 0.1 to 
5.0 %. If  the valve oscillates while opening 
or closing, INCREASE this parameter’s 
value!

Graphic representation of Ramp and Soak function

Process

Set value

PU-3

Time

Start

tr_1

tS_1

tr_4 tS_4

PU-1

PU-2

PU-4

PU-5

PU-6

PU-7

PU-8

tr_2

tS_2

tr_3 tS_3

          4 ramp soak (                 =                 )

          4 ramp soak (                   =                  )

          8 ramp soak (                 =                 )

Содержание ESM 7750

Страница 1: ...be taken to avoid injury from metal burrs which might be present The equipment can loosen from vibration and become dislodged if installation parts aren t properly tightened WARNING Before beginning...

Страница 2: ...17 18 output 3...

Страница 3: ...e two independent 4 segment processes essentially giving you two recipes or one 8 segment process If you want only one Ramp use the Stra parameter You do not have to use the Pu Tr and TS parameters By...

Страница 4: ...FF time 0 0 to 100 0 Seconds oAt1 oAt2 Output scale 0 0 20mA connect parallel 500 ohm for 0 10VDC 1 4 20mA 0 Alarm output 1 Manual Automatic 2 Sensor break alarm 3 PV is out of range 4 Ramp Soak finis...

Страница 5: ...Time 100 Process Output Stun Start Value PID coefficients are determined and system becomes stable Start Value Set Value 2 Process Set Value Time STEP RESPONSE TUNING Self Tune Process Value Time 100...

Страница 6: ...ngeAlarm Process Output 100 50 0 Process Value Cooling Set Value Heating Set Value Process Output 100 50 0 Process Value Heating Set Value Cooling Set Value If 0 Dead Band If 0 Overlap Band 1 877 798...

Страница 7: ...ak time up to 8 R S steps Ramp Soak menu EMO 700 relay output module must be plugged into Module 1 socket 100 240 V Opening Relay N L Supply Switch Closing Common Opening Valve Supply Input M V n n Op...

Страница 8: ...C AUTO SET SET SET SET SET SET C AUTO C AUTO C AUTO C AUTO SET SET SET SET C AUTO C AUTO C AUTO C AUTO C AUTO SET SET SET SET SET SET Technician Parameters Process Input Configuration C AUTO C AUTO C...

Страница 9: ...Control Parameters Technician Parameters Input Output 1 Module Configuration P 9 C AUTO C AUTO C AUTO C AUTO C C AUTO C AUTO C AUTO C AUTO C AUTO C AUTO C AUTO C AUTO C AUTO C AUTO SET SET SET SET SET...

Страница 10: ...ET SET C AUTO SET Technician Parameters Output 3 Configuration C AUTO C AUTO C AUTO C AUTO C C AUTO C AUTO C AUTO C AUTO C AUTO C AUTO C AUTO C AUTO C AUTO SET SET SET SET SET SET SET SET SET SET SET...

Отзывы: