www.z-band.com/866-902-2606
10
“GigaBUD 1000” Installation Guide
Installation Recommendations:
Category Cable:
Category 6 or better cable for horizontal wiring plant per ANSI/TIA-568-C
Coax Cable:
Terminate with Compression Connectors
RF Signal and Fiber Test Meters:
RF Signal Meter
Fiber Optic Power Meter
Fiber Cable:
RF input power range to “Z-Band Light TX”: Set as close to 20dBmV Flat as
possible
Video Source Signal Levels and Noise Levels should be recorded for all
Channels prior to connection to the Z-Band Light Transmitter or to the
Master GigaBUD 1000/s
If Singlemode Fiber Patch Panels are Terminated with Connectors other than
SC/APC, special Patch cords must be acquired to address the Incompatibility .
RF Input Levels:
Make sure that the Signal Levels and Noise Levels are checked at the proper
locations (The proper locations for Signal Level readings are noted in each
specific installation drawing)
Spend the time needed to get the Source Signal and Noise levels to the
required levels . The Intelligent AGC of the Z-Band System will maintain the
Source Signal Quality to all of the Displays - nothing else to adjust.
Televes
H30 SERIES
Meter/Analyzer
Advanced Fiber Solutions
Model OM120A