YZ Systems DynaPak 3010RNM Series Скачать руководство пользователя страница 30

30

DynaPak 3010RNM Version 01102001 ATEX Rev.

YZ Systems, Inc. • 3101 Pollok Drive • Conroe, Texas • USA • 77303 • P: 936.788.5593 • F: 936.788.5720

Diagram #8:  DuraSite Portable Sample Vessel Instructions

Purpose:  The DuraSite Portable Sample Vessel permits the
user to remove a liquid or gas hydrocarbon sample from a
pipeline or a sampling device.  This is accomplished without
changing the pressure of the product or exposing it to a
contaminant fluid.  If properly used and maintained the DuraSite
will provide many years of safe, accurate and clean sampling.

Use:  The DuraSite is a very safe device to use.  As with any
equipment dealing with flammable products, it is mandatory
that a good, thorough operator training procedure be
established prior to use.

Typical use of the cylinder would be as follows:

Step 1:  (In The Lab)  Connect a regulated inert gas supply to
the pre-charge valve.  The product valve should be open.  By
carefully controlling the pre-charge valve and the regulator, the
cylinder can be slowly charged with pre-charge gas (NOTE:
This should be done slowly to prevent slamming the piston
down to the opposite end).  The pressure on the pre-charge
pressure gauge should be brought to a reading of 10-50 psi
above the expected pressure of the product in the field.  Close
the pre-charge valve and disconnect the gas supply.  Check the
pre-charge valve, relief device, and the pre-charge pressure
gauge for leaks.  Any leaks should be stopped before
continuing.  The vessel should be placed in a padded carrying
case and made ready for field use.

USE STEP 2 FOR COLLECTION OF SAMPLE VIA SPOT SAMPLE
OR  FROM  COMPOSITE  ACCUMULATOR  VESSEL.
Step 2a:  
Connect the pre-charged sample vessel to the
product supply (NOTE:  the pre-charge pressure gauge
reading should be greater than the product supply pressure
reading.  If not, repeat Step 1 above).

Step 2b:  Once the vessel is connected to the product supply,
it is necessary to vent a small amount of product prior to filling
the vessel.  This assures fresh product and removes any air or
gas when dealing with liquids.  This can be done by loosening
the product purge valve a very small amount until the product
is purged.  After thorough purging, the product purge valve
should be tightened.

Step 2c:  The product pressure gauge reading should be
10-50 psi below the pre-charge pressure gauge reading.  By
carefully opening the pre-charge valve, the pressure becomes
equalized.  The pre-charge valve should be carefully controlled
so as to not vent the pre-charge gas too fast. The pre-charge
port should then be connected to a pipeline connection or relief
valve, which will allow movement of the piston while
maintaining pre-charge on the cylinder.

Step 2d:  When the cylinder becomes a maximum of 80% full
(see volume indicator), all valves should be closed.  The
product connection is slowly broken in order to vent any trapped
product.  After vessel removal, all connections should be
checked for leaks and the pre-charge and product valve ports
capped to prevent leakage.

Step 2e:  The vessel should be labeled and placed back into
the padded case and made ready for shipment.

USE STEP 3 FOR DIRECT CONNECTION TO SAMPLER.
Step 3a:
  Connect the sample discharge port to the sampler to
the product inlet port to the DuraSite using 1/8" stainless steel
tubing.

Step 3b:  (Gas sampling)  Connect the pre-charge port to the
DuraSite to the pipeline for pre-charge pressure, or configured
like the liquid sample application below. (Proceed to step 3d)

Step 3c:  (Light sampling)  Pre-charge the DuraSite as
indicated in Step 1, then install a pressure relief valve to the
pre-charge port and open the pre-charge valve on the DuraSite.
(The pressure relief valve should have a relief pressure setting
of approximately 100 psi above line pressure.)

Step 3d:  Open the product inlet valve of the DuraSite and the
purge valve on the sampler. Next open the purge valve on the
product end of the DuraSite and allow product to purge all lines
and connections out.

Step 3e:  Close purge valve and begin sample cycle.

Step 3f:  At the end of sample cycle, close product inlet valve on
the DuraSite and remove the DuraSite. Pack the DuraSite in
appropriate carrying case to meet D.O.T. guideline, with D.O.T.
paperwork and transport to lab for analysis.

Step 4:  (In The Lab)  Prior to analysis, the product should be
mixed.  This is accomplished simply and efficiently by inverting
the cylinder end-over-end,  causing the mixing ball to fall
through the product.  Approximately 10-12 trips of the mixing ball
through the product assures a homogenous solution.

Step 5:  The regulated pre-charge gas should be reconnected
to the pre-charge side of the cylinder.  The pre-charge gas
supply should remain open during analysis.

Step 6:  Purging a small amount of product from the vessel
removes unmixed product from the tee, relief device, gauge,
etc.  The unit can now be connected to a chromatograph and
the product analyzed.

Step 7:  After analyzing, the remainder of the product should be
dumped and the vessel properly cleaned.  Normal cleaning can
be accomplished by rinsing the product end with a petroleum
solvent and flushing with acetone.  If a more thorough cleaning
is required, the vessel should be disassembled.

WARNING:  A portable sample vessel should never be  filled
to more than 80%.  This allows a 20% pre-charge cushion to
absorb thermal expansion of the product.

Shipping:  Extreme care should be taken when preparing a
vessel for shipment.  Both valves should be capped to prevent
possible leakage.  The vessel should be placed in a snug-
fitting, well-padded and durable case.  All applicable DOT
regulations should be adhered to.

Содержание DynaPak 3010RNM Series

Страница 1: ...DynaPak3010RNM LiquidSampling SystemSupportManual Version 01102001 ATEX Rev...

Страница 2: ...2 DynaPak 3010RNM Version 01102001 ATEX Rev YZ Systems Inc 3101 Pollok Drive Conroe Texas USA 77303 P 936 788 5593 F 936 788 5720...

Страница 3: ...illinnowayincreasethescopeofthiswarranty Iftheproductfailstocomplywiththewarrantysetforthherein YZ s entireliabilityandthecustomer sexclusiveremedywillbereplacementoftheproduct s or atYZ soption YZ sr...

Страница 4: ...presentative or YZ Customer Service at 936 788 5526 2 System Components The primary components of the DynaPak 3010RNM Sampling System are illustrated here Filter Regulator Z 65 Controller Stroke Adjus...

Страница 5: ...sts of a 5 watt solar panel with RM 12 charger regulator module and internal 12V 5 Amp hour battery pack 3 Theory of Operation The DynaPak 3010RNM Sampler is a liquid samplingsystemwhichusesthepneumat...

Страница 6: ...y 75 psi to the actuation gas connection located on the left hand side of the sampler d Connect the sample out connection to the samplevessel e Wire the PIM 100 to the flow input device Turbine Meter...

Страница 7: ...in section 8 An input adjustment potentiometer is provided on the PIM 100 to allow adjusting the input sensitivity Refer to diagram 7 Wiring Control Document 4 System Installation Element Optional Lo...

Страница 8: ...sultthefactoryforproperprocedure Element Optional Loop Driver w Static Mixer Optional By Customer Vessel Tray Product Supply Relief Valve Static Mixing Loop Actuation 50 75 psi By Customer 2 Pipestand...

Страница 9: ...mer counter dials to the 0 position 00 minutes 6 6 Move mode switches 1 2 and 3 to the on position The pump will begin stroking once every 2 seconds in a diagnostic test mode 6 7 Allow the sampler to...

Страница 10: ...time interval and largest pump displacement setting possible NOTE The time 18 minutes above corre sponds to the dial setting shown for the Z 65 6 1 model with the timer range setting in the factory po...

Страница 11: ...6 Turn mode switch 3 to on 7 7 Turn mode switch 4 to off 7 8 Press the test button once to initiate the timersequence 7 3 Adjust the pump volume adjustment knob to the value used in the calculations...

Страница 12: ...forthatnumberorinput pulses For example If your flow meter is calibrated for 2300 pulses per metered volume meter k factor and you want one output pulse per metered volume from the PIM 100 your diviso...

Страница 13: ...N 4 4 S1 3 ON 0 The input signal threshold level is set from the factory to work with most applications However due to varying cable lengths and wire types the threshold level may need to be adjusted...

Страница 14: ...nter setting is greater than 99 decrease the pulses per volume metered 1 your pump displacement from 1 to 4cc s a __________ 2 your sample cylinder volume in cc s 300cc 500cc etc b __________ 3 averag...

Страница 15: ...is a dry contact a interface between the PIM 100 and the Z 65 6 1 terminal strip will be pre wired b Turn mode switch 1 to on c Turn mode switch 2 to off d Turn mode switch 3 to on e Turn mode switch...

Страница 16: ...e pump body and the probe body Do not remove the inlet check valve body from the manifold unless cleaning is necessary To replace the inlet check valve o ring cut the o ring off the head of the dart a...

Страница 17: ...revent damage J Install the body bushing into the bottom of the pumpbody K Insert all other bushings springs and o rings in their respective sequence on the plunger shaft L Carefully install assembly...

Страница 18: ...good and a red LED will illuminate if the battery is low NOTE the solenoid must be connected to test the battery condition Battery condition cannot be tested with a volt meter Replacing a Depleted Bat...

Страница 19: ...s for the DynaPak 3000RNM Series gas samplers PartNumber Description Qty Location C4 0004 filterelement 1 see diagrams 3 and 4 D3 0115 DP 3000 HP pump seal kit 1 see diagrams 1 and 2 D3 0116 YZ filter...

Страница 20: ...crewsandremovethe six position terminal strip and cover This will expose the battery pack and the three position configuration jumper located in the lower right corneroftheZ 65 6 1controllerassembly D...

Страница 21: ...g dials 1 Z 65 6 1 Range Setting a xx minutes set the configuration jumper to the far left position factory setting b x x minutes set the configuration jumper to the center position Note to obtain max...

Страница 22: ...unter input ter 3 the green LED will turn on and off and the red LED will illuminate again This will normallyoccurveryquicklyandgivethe appearance that the green LED blinks on when the pulse input is...

Страница 23: ...P N B1 0051 Seal Spring Housing P N A5 1012 20 Micron Filter P N C4 0022 P N C3 0008 P N B1 0020 Inlet Screen P N C4 0006 Inlet Check Valve Spring Guide Inlet Check Valve Spring O Ring 006 P N A5 100...

Страница 24: ...t Detent Upper Diaphragm Housing P N B1 0051 P N C3 0005 P N B1 0030 Set Screw P N C0 0096 P N C0 0014 Cap Screw 6 Each O Ring 012 P N B1 0020 P N C0 0026 Inlet Screen P N C4 0006 P N C3 0008 P N C4 0...

Страница 25: ...pring Retaining Nut P N A3 0072 Seat O Ring 012 P N A3 0070 P N A5 1012 P N A3 0069 Piston P N C3 0009 Piston Spring Adjustment Screw P N A3 0066 Spring Cap P N A3 0068 Lower Dart O Ring 120 P N A5 11...

Страница 26: ...ring Retaining Nut P N A3 0072 Seat O Ring 012 P N A3 0070 P N A5 1012 P N A3 0069 Piston P N C3 0009 Piston Spring Adjustment Screw P N A3 0066 Spring Cap P N A3 0068 Lower Dart O Ring 120 P N A5 112...

Страница 27: ...1 1 Qty 1 1 G1 0001 Stroke Counter Assembly Z 65 200 Fuse Replacement Kit Solenoid Valve Cable Assembly Thumb Screw Model Z 65 6 03 Model Z 65 6 1 Face Plate Mode Switch BCD Switch Terminal Strip 6 P...

Страница 28: ...8 5593 F 936 788 5720 Diagram 6 LinkPlus Outlet Inlet p s i P N A8 0033 Stainless Steel Pressure Gauge Set Screw P N C0 0099 P N A3 0217 Valve Handle P N A3 0062 Valve Seat P N A3 0063 Bonnet Stem Ass...

Страница 29: ...ersion 01102001 ATEX Rev YZ Systems Inc 3101 Pollok Drive Conroe Texas USA 77303 P 936 788 5593 F 936 788 5720 Diagram 7 Z 65 Installation Notes Wiring Control Documentation System Installation Notes...

Страница 30: ...nder becomes a maximum of 80 full see volume indicator all valves should be closed The product connection is slowly broken in order to vent any trapped product After vessel removal all connections sho...

Страница 31: ...ct Head YZ UniValve Purge Valve Nut P N A3 0080 P N A3 0063 Valve Seat P N C6 1003 Ser 4608 P N 12 1006 Ser 0321 and Prior P N 12 1007 Ser 0322 0613 P N 12 1008 Ser 0614 4087 P N C6 1002 Ser 4088 Pist...

Страница 32: ...u were doing when the problem occurred Operation Specifications PowerRequirements 14 5VfromZ 65 battery pack 85microamperes quiescent 110microamperes Max Minimum Input Signal 20mV peak to peak 300mH I...

Страница 33: ...33 DynaPak 3010RNM Version 01102001 ATEX Rev YZ Systems Inc 3101 Pollok Drive Conroe Texas USA 77303 P 936 788 5593 F 936 788 5720 Notes...

Отзывы: