ST950S Plus+ Installation and Commissioning Manual
Figure 60. Termination of Street Cable Armouring
If there is only one Smartloop linked to the upstream node, the earth cable available from the
Smartloop Plus+ Network cable is terminated at the CET gland.
If multiple Smartloops to be linked together then an additional earth wire will be required to bridge the
two CET glands.
Page 102