FIG. C: HEATER DIMENSIONS & WATER BOOSTER POSITION
–
MONTE BASE WOODBURNER
(not to scale)
Note: A water booster shall be fitted only with “Wet” model installations unless otherwise allowed by Regional Council rules.
FIG. D: HEATER POSITION.
(Not to scale)
FIG E: FLUE SYSTEM REQUIREMENTS
(not to scale)
FIG D: MINIMUM FIRE TO COMBUSTABLE WALL CLEARANCES - MONTE WOOD-BURNER
(WITH YUNCA FLUE MOUNTED SHIELD FITTED). Measurements in millimetres.
A
B
E
F
G
H
200
450
280
366
782
600
FIG D: MINIMUM FLOOR PROTECTION MEASUREMENTS
(WITH YUNCA FLUE MOUNTED SHIELD FITTED). Measurements in millimetres.
C
D
J
K
L
M
N
O
P
300
125
913
999
1481
1288
633
663
699
Note! All Dimensions are in millimetres
Above: Non combustible wall clearances
. Brick lining. From the floor to within 25mm of ceiling. Leave air vents
at the bottom to allow airflow in the cavity. If Yunca flue mounted shield is fitted, brickwork may be 1200mm high
as long as all vertical joints in top and bottom of brickwork are left out to allow airflow when brickwork is capped.