PLACING
The unit should be bolted to the floor to ensure no movement in the event of an earthquake or
similar.
(FIG 1)
Laying of the gas pipes and the electrical supply may need to be completed before the heater
is finally positioned. (Fig 2.) (6mm dia x 50mm Coach Bolts Supplied).
If the appliance is being attached to a concrete floor dyna bolts should be used, if the floor is
wooden the bolts used should be long enough to go fully through the floorboards and fixed with
nuts and washers from the underside.
(Fig 1.)
(Fig 2.)
30 mm
15 mm
15 mm
80 mm
Gas Pipe
Hole
Electrical
Cable
Bolt Points
Test Point
Grate
Cowl back