Commissioning

When installed the installer should operate the 

YUNCA ALLURE

 to ensure that all features are

operating correctly.
Eg. On / Off operation, ramp up and down of fan speed and flame height. Refer below.

Turning on your YUNCA ELECTRONIC ALLURE

1.  Turn the Gas and Power supply on.
2.  Press the

 On / Off

 

button 

once. LED will light up on the front of the base.

3.  The burners will light at the same setting and fan speed as they were when previously turned

off.

4.  Adjust the

 Flame height 

button as required to achieve the required heat output.

5.  Adjust

 Fan speed 

button to achieve the optimum speed.

Turning off 

(immediate, no timer delay).

1.  Press 

On / Off

 

button 

once.

Turning off

 (using timer delay).

2.  Press the

 “Off (delayed)” button 

once.

3.  The Receiver will flash to indicate the timer delay activated.
4.  The fire will shut down after 30 minutes.
5.  To restart, follow the to start procedure.

Fig 8:

 Hand Control

Direct the infra-red beam from this hand control to the receiver mounted
at the Control front.  The receiver will “light up” when receiving a signal
from the hand control.

The hand control operates on 4 AAA size alkaline batteries. Remove the
battery cover on the back of the hand control to insert batteries paying
attention to the polarity.

Note: multiple pushes of a button may cause a lock out in the
electronics. If this happens turn the power supply off and restart
the Gas fire.

Pressing the 

On / Off

 

button

 once will initiate the lighting sequence. The

Receiver will light up.  The lighting sequence will take approximately 30
seconds and a faint clicking may be heard as sparking takes place.

Pressing the 

On / Off button

 a second time will turn off the fire.

Flame height

  (heat output) is increased by pressing on the + sign of

flame button and reduced by pressing the – sign of the flame button.

Fan  speed

  is  increased  by  pressing  on  the  +  sign  of  fan  button  and

reduced by pressing on the – sign of the fan button.

Pressing

 Off (Delayed) 

will initiate a 30-minute timer delay off.

This can be cancelled by re-pressing the 

Off (Delayed) 

button.

Содержание ALLURE 930-730-630

Страница 1: ...IC Install Ops Apr08 Page 1 of 23 ALLURE GAS OPEN FIRE ELECTRONIC MODELS 930 730 630 APRIL 2008 INSTALLATION OPERATION MAINTENANCE WARRANTY INFORMATION These instructions should be stored in a convenient safe place for ready reference ...

Страница 2: ...M 17 19 Appendix B SPARE PARTS LIST 20 21 Appendix C WARRANTY 22 Appendix D WARRANTY REGISTRATION 23 INTRODUCTION Welcome and congratulations on purchasing your YUNCA ALLURE INDOOR ELECTRONIC CONTROL flued gas open fire Please read these Operating Instructions carefully before attempting to operate the heater and ensure all members of your home understand how this elegant heater functions If you h...

Страница 3: ...TERIALS NEAR THIS APPLIANCE DO NOT SPRAY AEROSOLS IN THE VICINITY OF THIS APPLIANCE WHILE IT IS OPERATIONAL ENSURE THAT HOME VENTILATION SYSTEMS DO NOT AFFECT THE DRAW OR FLAME PATTERN OF THE FIRE STAINLESS STEEL FASCIAS are shipped with protective plastic in place to reduce the risk of damage in transit Remove this plastic immediately before fitting the fascia to the fire Do not use abrasive clot...

Страница 4: ...940 200 250 Also available is a Bottom Fascia Strip for each model This strip 730 930 85 mm high 630 55mm high is fitted below a regular three sided fascia for a picture frame look CLEARANCES Floor protector 300mm in front of and 100mm from side of firebox opening 6mm minimum thickness using heat resistant materials Built in heat cell zero clearance requires minimum 25mm from combustibles all arou...

Страница 5: ...approaches with air venting but both require the use of zero clearance flue kits 1 For dedicated chimney chases NOT open to the roof ceiling cavity The chase must be vented at the bottom near the base level of the fireplace with 2 individual vents preferably one each side of the fire each with a minimum size of 100mm x 50mm opening Identical vents must be repeated near the top of the chase prefera...

Страница 6: ...m 930 model uses 200mm stainless steel FLUE PIPES together ensuring all seams are in line using 3 pop rivets or screws and seal joints with appropriate sealant Use ST ST rivets or screws 6 Fit FLUE SPACER BRACKETS to FLUE if necessary to maintain air gap between FLUE PIPES and OUTER HEAT SHIELD 7 Lower stainless steel FLUE PIPES from the roof into the OUTER HEAT SHIELD crimped ends towards heater ...

Страница 7: ...b In the case of a Flat roof ie With a Pitch of less than 30 not less than 1500 mm above the Highest Point of the Roof c In any case the length of the Flue shall be not less than 3 6 metres from the Top of the Appliance Flue Spigot 2 Minimum Total Flue Length 3 6 metres 3 Flue must be 1 2 metres high before any Lateral is fitted 4 Any Lateral run in a Flue shall be a No more than 1 0 metre in the ...

Страница 8: ... need to be completed before the heater is finally positioned Fig 2 6mm dia x 50mm Coach Bolts Supplied If the appliance is being attached to a concrete floor dyna bolts should be used if the floor is wooden the bolts used should be long enough to go fully through the floorboards and fixed with nuts and washers from the underside Fig 1 Fig 2 30 mm 15 mm 15 mm 80 mm Gas Pipe Hole Electrical Cable B...

Страница 9: ...the first two threads at the tip of any gas connection All joints should be tested for leaks before operating the fire Gas pressure requirements Correct gas pressure and the use of a properly sized gas supply line are essential for the safe and efficient performance of this appliance The inlet and outlet pressures at the control must be tested on installation Note Improper gas pressure will affect...

Страница 10: ... This will expose the control valve so manometer tubes can be attached to the pressure taps as shown below Fig 4 Important Ensure Pressure Tap is tightened and checked for leaks after testing Control Valve Parts Fig 4 and Fig 5 1 Main Gas Inlet 2 Inlet Pressure Tap Point Tighten to torque 1 0Nm 3 High Pressure Adjust 10mm Brass Nut 4 Low Pressure Adjust Red Plastic X Screw 5 Outlet Pressure Tap Po...

Страница 11: ...t adjustment will be required during installation Setting Pressures Fig 4 and 5 MAXIMUM PRESSURE The modulator is adjusted by screwing IN Brass Nut 5 to increase the outlet pressure and screwing OUT to decrease it MIMIMUM PRESSURE Keep Brass Nut 5 stationary screw IN the Red Plastic Screw 4 to increase the pressure and screw it OUT to decrease the pressure Pilot Outlet 4 5 ...

Страница 12: ...A STRIP Not shown This part may be fitted along the base of a regular three sided fascia to give a picture frame effect When the fascia front is removed you will see where the bottom strip is fitted using two screws 4 TOP LOUVRE 1 Top Slides out 5 TOP LOUVRE 2 Bottom Remove 2 screws and slide off 6 BOTTOM CONTROL AND GRILL Remove 2 screws and lift out 7 COWL TOP FRONT Remove 2 screws and slide out...

Страница 13: ...lift out 5 Rear Tray Remove screws from right and left side lift out 6 Burners Lift out 7 Manifold Baffles Lift out left and right baffles SETTING THE FIRE 1 Replace all panels and grate 2 Check for gas ignition also check that the remote control operates flame and fan boost before setting the fire 3 Follow layout see following pages for setting of the fire 4 Re check gas ignition remote control o...

Страница 14: ...per row the 630 uses 8 coals per row layout as shown below from left to right Bottom Rear Row Bottom Front Row Top Rear Row Top Front Row 930 26 x No1 Coals 26 x No2 Coals 4 rows of 13 730 20 x No1 Coals 20 x No2 Coals 4 rows of 10 630 16 x No1 Coals 16 x No2 Coals 4 rows of 8 2 1 2 1 2 1 2 2 1 1 1 2 1 2 1 2 1 2 1 2 1 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 1 2 2 1 2 1 2 2 1 1 ...

Страница 15: ...2 10 x No2 8 x No2 Layout shown is for the 930 model using 13 coals per row The 730 model uses 10 coals per row the 630 uses 8 coals per row layout as shown below from left to right Rear Row Front Row Logs 630 730 930 1 x B 1 x B 2 x B 1 x C 2 x C 1 x C 1 x D 1 x D 2 x D 1 2 1 2 1 2 1 2 1 2 2 1 2 1 2 1 2 1 2 1 2 1 1 2 2 1 630 730 C B D 930 ...

Страница 16: ... Fig 8 Hand Control Direct the infra red beam from this hand control to the receiver mounted at the Control front The receiver will light up when receiving a signal from the hand control The hand control operates on 4 AAA size alkaline batteries Remove the battery cover on the back of the hand control to insert batteries paying attention to the polarity Note multiple pushes of a button may cause a...

Страница 17: ...operating when a button is activated Change remote batteries Check mains power is on Ensure beam from the remote Check the fuse in the back of the control Box Remove rear tray to access No spark at pilot burner Check connection between electrode in pilot assembly and lead from control Poor or no spark Clean any build up Carbon on or around the Spark electrode Tracking of spark along spark electrod...

Страница 18: ...that the clearances around the appliance match those stated in this manual Flueway blocked Remove blockage Check cowl LPG gas mix incorrect Contact supplier to clean out bottle Flame Height very large or very low Use remote and Ramp up or down Check gas inlet pressure and running pressure Check and set gas pressure to manufacturers specifications Main burners extinguishing Flue down draughting Thi...

Страница 19: ...Revised 04 04 08 ALLURE ELECTRONIC Install Ops Apr08 Page 19 of 23 ...

Страница 20: ...e 6791GO9 930 Manifold Assembly No Jets 6791GO7 730 Manifold Assembly No Jets 6791GO6 630 Manifold Assembly No Jets 6624GO Fan Assembly Main Gas Pipe NAT Burner Plug Insert 6950A1 Coal No 1 6950A2 Coal No 2 6950B Log B 6950C Log C 6950D Log D Duroboard 6955GO6 Rear Tray 630 6956GO6 Front Tray 630 6958GO6L Manifold Baffle 630 6955GO7 Rear Tray 730 6956GO7 Front Tray 730 6958GO7L Manifold Baffle Lef...

Страница 21: ... Main Jets ALL are 1 2 mm dia 930 model LPG MAIN JETS 1 2 3 4 5 6 7 8 9 10 0 6 0 7 0 7 0 8 0 8 0 8 0 8 0 7 0 7 0 6 930 model Natural Main Jets ALL 1 2 are mm dia Fascia Panels Should you require replacement fascia panels please also supply the measurements as there have been some design changes over time Name Gunmetal Black Silver Stainless Steel Fascia Front three sides Fascia Front bottom strip ...

Страница 22: ...use in outdoor situations A manual control OUTDOOR series is available specifically designed for outdoor use Please contact your Yunca Agent for details This warranty is void if the recommended service schedule is not implemented as suggested in this manual and carried out by a suitably qualified person Limitations of Liabilities Yunca Heating hereby waivers any liability for incidental and conseq...

Страница 23: ...nstalled By Date Manufactured by Yunca Gas Dunedin PO Box 500 DUNEDIN 9054 Telephone 03 488 4342 Email dunedin yunca co nz Cut along here MANUFACTURER COPY This section must be returned within 10 days of purchase YUNCA ALLURE ELECTRONIC WARRANTY REGISTRATION Serial Model No Gas Type Purchase Date Purchasers Name Purchasers Address City Postcode Telephone Where Purchased Installed By Date Return to...

Отзывы: