![Yukon LWO-112 Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/yukon/lwo-112/lwo-112_owners-manual_3694153020.webp)
FIG. 13
OIL BURNER INSTALLATION
•
Model LWO-112 burner
has a (140,000 BTU input)
1.00 G.P.H. 80 degree H nozzle installed at the factory. •
Model LWO-168 burner
has a (189,000 BTU input)
1.35 G.P.H. 80 degree H nozzle installed at the factory.
Install burner as follows
:
1. Make sure hole in side of pyrolite chamber lines up
with hole in the end of the blast tube. (See Fig. 13)
2. Remove nuts from burner mounting studs on face of
the furnace.
3. Install drip shield (shipped in blower compartment)
over studs. Place gasket (packed in burner box) over
drip shield. (Fig. 14)
4. Assemble mounting flange over burner blast tube (flat
surface away from burner housing). Do not tighten
clamping screws.
5. Insert burner tube into furnace. Align holes in
mounting flange over studs on furnace. Replace nuts
removed in step 2 above and tighten.
6. Insert burner so that burner housing is tight against
mounting flange (end of blast tube should be flush
with inside of pyrolite chamber). Level burner and
tighten clamping screws.
GAS BURNER INSTALLATION
•
Model LWG-112
A 7/32" dia. orifice has been installed
at the factory. (140,000 BTU input - nat. gas). To
convert to LP gas, see manufacturers instructions
packed with the burner.
•
Model LWG-168
A "F" (.257 dia.) orifice has been
installed at the factory (189,000 BTU input - nat. gas).
To convert to LP gas, see manufacturers instructions
packed with burner.
Install burner as follows
:
1. Make sure hole in side of pyrolite chamber lines up
with hole in the end of the blast tube. (See Fig. 13)
2. Remove nuts from burner mounting studs on face of
the furnace.
3. Install drip shield (shipped in blower compartment)
over studs. Place gasket (packed in burner box) over
drip shield. (Fig. 14)
4. Assemble mounting flange over burner blast tube (flat
surface away from burner housing). Do not tighten
clamping screws.
5. Insert burner tube into furnace. Align holes in
mounting flange over studs on furnace. Replace nuts
removed in step 2 above and tighten.
6. Insert burner so that burner housing is tight against
mounting flange (end of blast tube should be flush
with inside of pyrolite chamber). Level burner and
tighten clamping screws.
FIG. 14
Drip
Shield
CUT AWAY VIEW
BURNER COMBUSTION CHAMBER
Burner
Blast Tube
Pyrolite Liner
In combustion
Chamber
20
IMPORTANT!
PYROLITE LINER (FIG 13) MUST BE
CHECKED REGULARLY TO ENSURE
INTEGRITY OF MATERIAL IS GOOD.
FAILURE TO REPLACE PART WHEN
NECESSARY MAY RESULT IN DAMAGE
TO THE STEEL CHAMBER.
Installation
Содержание LWO-112
Страница 9: ...9 Furnace Features Eagle I Husky...
Страница 11: ...11 Furnace Features Eagle II Polar...
Страница 31: ...OIL AND WOOD COAL HEATING WITH A C 31 Wiring Diagrams DS 103 DAMPER CONTROL...
Страница 32: ...GAS AND WOOD COAL HEATING ONLY 32 Wiring Diagrams DS 103 DAMPER CONTROL...
Страница 33: ...GAS AND WOOD COAL HEATING WITH A C 33 Wiring Diagrams DS 103 DAMPER CONTROL...
Страница 56: ...EAGLE I HUSKY MODELS LWO 112 LWG 112 56 Exploded Views Parts Lists...
Страница 58: ...EAGLE II POLAR MODELS LWO 168 LWG 168 58 Exploded Views Parts Lists...
Страница 62: ...WAYNE MODEL P250AF DIN GAS BURNER 62 Exploded Views Parts Lists...