
9
5-4/ FLOOR LOADING
The ground on which the battery will be installed must be able to bear the weight
of the battery, cabinet or case. The total weight is indicated on the assembly plan
supplied by YUASA.
Attention must also be paid to the point loading (weight per stand insulator foot).
5-5/ HANDLING
Depending on the model, the weight of the battery cells or monoblocs can be
significant.
Take all the required precautions involved in installing batteries in cabinets or
stands and use lifting equipment if necessary.
Wear safety shoes, handling gloves and a helmet.
Do not lift the batteries by their terminals (this may rupture the terminal
sealing).
Respect the handling order of the packages.
6/ INSTALLATION IN CABINETS OR ON YUASA STANDS
It should be noted that it is always preferable to install batteries on stands rather than
in cabinets, for the following reasons:
Installation and maintenance both reduced and easier.
More efficient ventilation.
Simplified connections between monoblocs (more single rigid connection links,
less end cables, reduced voltage drops).
Reduced equipment and installation costs.
For the assembly and connections, refer to the documents supplied with the battery:
- Yuasa assembly/wiring plan and nomenclature.
- Instructions for assembly in cabinets or on stands.
Before installing the monoblocs in a cabinet or on site, make sure that the shelves
and beams are stable and well-attached.
Содержание NP Series
Страница 22: ...22 NOTES...
Страница 23: ...23...