Air F ilter R egulators Y T -200, Y T -205
- 5 -
Instruction
(1) Before supplying air pressure into YT-200, turn adjust bolt counter-clockwise, so
the ring is not pushed.
(2) Install pressure gauge on the secondary pressure output port. The pressure
gauge indicates primary pressure that is being output.
(3) Air pressure is supplied through primary pressure input port after output port is
being blocked by using ball-valve or other fitting tools.
(4) When the secondary pressure reaches at set level, fasten the adjust bolt
completely.
Output and Flow (LPM)
Pressure
Flow (LPM)