
5
youngmangroup.com
In addition to the Operator of the BoSS X-Series
machine the Site Surveyor and Planner and
machine Demonstrator should be competent to
fulfil these roles as specified in the Safe Use of
MEWP’s – Code of Practice sections 7.2.6 and
7.2.7 respectively.
When planning the job the Site Surveyor and
Planner should work through the following
stages:
a.
Identify the task to be undertaken.
b.
Select an appropriate MEWP.
c.
Identify the hazards associated with the
task.
d.
Carry out a risk assessment.
e.
Identify control measures.
f.
Develop the method to be used.
g.
Record the planning in a Method
Statement (including any contingency
activities for personnel rescue).
h.
Communicate the plan to all persons
involved.
i.
Review the plan before the job
starts and incorporate any changing
circumstances.
1.5 MoDIfIcatIons
No modifications shall be made to any BoSS
X-Series machine unless Youngman Group
Ltd. has given full written approval. If in doubt
please contact us for advice:
Youngman Group Ltd.
The Causeway
Maldon
Essex
CM9 4LJ
United Kingdom
t
+44 (0) 1621 745900
f
+44 (0) 1621 859845
e
1.4 selectIon anD
MInIMuM attrIButes of oPerators
Содержание BOSS X Series
Страница 9: ...7 youngmangroup com 13 1 6 terMInology 12 16 20 14 18 22 15 21 17 19 23...
Страница 36: ...34 BoSS X Series Instructions for Use notes...
Страница 37: ...35 youngmangroup com notes...
Страница 38: ...36 BoSS X Series Instructions for Use notes...
Страница 39: ...37 youngmangroup com notes...