background image

BUILD METHOD

7

From the protected trap door position fit Horizontal 

Braces as guardrails on the 2nd and 4th rungs (in 

that order) above the platform level.

Do not climb the deck until it is fully guardrailed.

8

Fit Horizontal Braces to link the towers, as shown.

FILE: S140105

Drawn: 29/01/2015

Page: 11 OF 14

Issue: A

FILE: S140105

Drawn: 29/01/2015

Page: 11 OF 14

Issue: A

BoSS IS A REGISTERED TRADEMARK OF YOUNGMAN GROUP LTD

© 

YOUNGMAN GROUP LTD - 29/01/2015  

FOR UP TO DATE INFORMATION ON THIS PRODUCT CHECK

www.youngmangroup.com/brands/BoSS-towers  

LINKED PREFABRICATED TOWER SCAFFOLD - LADD 3T

Содержание Boss Plus

Страница 1: ...bricated tower scaffold system and should be used in conjunction with the appropriate corresponding BoSS scheme drawing EN1004 mobile access tower user guide and product datasheet BoSS IS A REGISTERED...

Страница 2: ...14 Issue A FILE S140105 Drawn 29 01 2015 Page 2 OF 14 Issue A LINKED PREFABRICATED TOWER SCAFFOLD LADDERSPAN 3T BoSS IS A REGISTERED TRADEMARK OF YOUNGMAN GROUP LTD YOUNGMAN GROUP LTD 29 01 2015 FOR U...

Страница 3: ...y Rated for External or Internal Use i e exposed to wind or not Maximum wind load Maximum foot load Tie loads where applicable Before each use Check that each prefabricated tower scaffold is complete...

Страница 4: ...oved DURING Mobile tower structures shall be moved with the upmost caution Any stabilisers fitted must remain in position and raised no more than 25mm from the ground Prefabricated tower structures mu...

Страница 5: ...the tower away from the structure at the point of access There must be no gap between the platform of the prefabricated scaffold tower and the place being accessed through which a person tools or mate...

Страница 6: ...uipment are on site undamaged and that they are functioning correctly particularly the brace claw locking mechanism Damaged or incorrect components shall not be used Component weights can be found on...

Страница 7: ...platfrom height tower starting with a 2 rung frame FILE S140105 Drawn 29 01 2015 Page 7 OF 14 Issue A LINKED PREFABRICATED TOWER SCAFFOLD LADDERSPAN 3T FILE S140105 Drawn 29 01 2015 Page 7 OF 14 Issu...

Страница 8: ...opriate corresponding scheme drawing FILE S140105 Drawn 29 01 2015 Page 8 OF 14 Issue A LINKED PREFABRICATED TOWER SCAFFOLD LADDERSPAN 3T FILE S140105 Drawn 29 01 2015 Page 8 OF 14 Issue A BoSS IS A R...

Страница 9: ...s open inwards as indicated with arrows Ensure all interlock clips are engaged 4 Fit Diagonal Braces between 13th and 15th rungs as shown FILE S140105 Drawn 29 01 2015 Page 9 OF 14 Issue A LINKED PREF...

Страница 10: ...of the frames Ensure all wind locks are engaged FILE S140105 Drawn 29 01 2015 Page 10 OF 14 Issue A LINKED PREFABRICATED TOWER SCAFFOLD LADDERSPAN 3T FILE S140105 Drawn 29 01 2015 Page 10 OF 14 Issue...

Страница 11: ...guardrailed 8 Fit Horizontal Braces to link the towers as shown FILE S140105 Drawn 29 01 2015 Page 11 OF 14 Issue A FILE S140105 Drawn 29 01 2015 Page 11 OF 14 Issue A BoSS IS A REGISTERED TRADEMARK...

Страница 12: ...BoSS Infinity Multipurpose frames Move Stabilisers so that they are parallel to frames The build is now complete To dismantle the tower Simply follow the assembly steps in reverse ensuring that the 3T...

Страница 13: ...forms located and wind locks engaged Interlock clips engaged Toe boards located Check guardrails are fitted correctly positively locked Tower use information and handover certificate in place FILE S14...

Страница 14: ......

Отзывы: