background image

Page 4

05103-45-90(E)

VERTICAL  SHAFT  BEARING  REPLACEMENT

Vertical  shaft  bearings  are  much  larger  than  the  anemometer 

bearings.  Ordinarily,  these  bearings  require  replacement  less 

frequently than anemometer bearings. Check bearing condition 

using a Model 18331 Vane Torque Gauge.

Since  this  procedure  is  similar  to  POTENTIOMETER 

REPLACEMENT, only the major steps are listed here.

1.  REMOVE  MAIN  HOUSING

2.  UNSOLDER  TRANSDUCER  WIRES AND  REMOVE

    TRANSDUCER ASSEMBLY

  Loosen  set  screws  at  base  of  transducer  assembly  and 

remove  entire  assembly  from  vertical  shaft.   

3.  REMOVE  VERTICAL  SHAFT  BEARING  ROTOR  by  sliding 

it    upward  off  vertical  shaft.

4.  REMOVE  OLD  VERTICAL  BEARINGS AND  INSTALL  NEW 

BEARINGS.  When  inserting  new  bearings,  be    careful  not 

to  apply  pressure  to  bearing  shields.

5.  REPLACE  VERTICAL  SHAFT  BEARING  ROTOR. 

6.  REPLACE  TRANSDUCER  &  RECONNECT  WIRES

7.  REPLACE  MAIN  HOUSING

8.  ALIGN  VANE

9.   REPLACE  NOSE  CONE

WARRANTY

This  product  is  warranted  to  be  free  of  defects  in  materials  and 

construction for a period of 12 months from date of initial purchase. 

Liability is limited to repair or replacement of defective item. A copy 

of the warranty policy may be obtained from R. M. Young Company.

CE COMPLIANCE

This product has been tested and shown to comply with European 

CE  requirements  for  the  EMC  Directive  (see  Declaration  of 

Conformity below). Please note that shielded cable must be used.

Declaration of Conformity

R. M. Young Company

2801 Aero Park Drive

Traverse City, MI 49686 USA

Model 05103-45 Wind Monitor

The undersigned hereby declares on behalf of R. M.

Young Company that the above-referenced product, to

which this declaration relates, is in conformity with the

provisions of:

Council Directive 2004/108/EC (December 15, 2004)

on Electromagnetic Compatibility

David Poinsett

R&D Manager

Содержание 05103-45

Страница 1: ...CAL INSTRUMENTS INSTRUCTIONS R M YOUNG COMPANY 2801 AERO PARK DRIVE TRAVERSE CITY MICHIGAN 49686 USA TEL 231 946 3980 FAX 231 946 4772 WEB www youngusa com P N 05103 45 90 REV E102811 WIND MONITOR MOD...

Страница 2: ...t imbalance will not degrade performance The potentiometer requires a stable DC excitation voltage Do not exceed 15 volts When the potentiometer wiper is in the 5 deadband region the output signal is...

Страница 3: ...ghten mounting post band clamp f Engage orientation ring indexing pin in notch at instrument base g Tighten orientation ring band clamp CALIBRATION The Wind Monitor is fully calibrated before shipment...

Страница 4: ...potentiometer adjust thumbwheel on potentiometer shaft and tighten set screw g Place potentiometer coupling on potentiometer adjust thumbwheel Do Not tighten set screw yet 5 RECONNECT TRANSDUCER WIRES...

Страница 5: ...SHAFT BEARING ROTOR 6 REPLACE TRANSDUCER RECONNECT WIRES 7 REPLACE MAIN HOUSING 8 ALIGN VANE 9 REPLACE NOSE CONE WARRANTY This product is warranted to be free of defects in materials and construction...

Страница 6: ...Page 5 05103 45 90 E CABLE WIRING DIAGRAM...

Страница 7: ...Page 6 05103 45 90 E BEARING REPLACEMENT POTENTIOMETER ADJUSTMENT...

Страница 8: ...Page 7 05103 45 90 E GENERAL ASSEMBLY REPLACEMENT PARTS...

Страница 9: ......

Страница 10: ...Accessories Model 18802 Anemometer Drive Model 18112 Vane Angle Bench Stand Model 18310 Propeller Torque Disc Model18331Vane Torque Gauge Model 18301 Vane Alignment Rod Model 18212 Vane Angle Fixture...

Страница 11: ...e Torque Gauge checks vane bearing torque of the Wind Monitor family sensors Slip the fixture over the main housing and make simple yet accurate vane torque measurements Charts relating vane torquetov...

Отзывы: