Hardware Operation Manual
40
Step 4 : Secure the subsystem in the server rack
Fasten two M5 screws through the chassis ears in the front side of the
chassis.
The JBOD system should now be securely mounted into the rack.
Figure 4: Secure the subsystem in the server rack
Install the JBOD system into the Rack Cabinet
1.
Lift the JBOD system (one person on each side of the JBOD System) and
approach the rack with the button-back of the JBOD system facing the end of
Slide rails.
2.
Slide the JBOD system evenly and all the way into the rack cabinet.
3.
Using the rack mount screws, secure the top and bottom of the JBOD system to
the rack frame.
Caution
The JBOD system is heavy; two person are required to move the
system in the procedure.
Содержание 3 SAS
Страница 1: ...Yotta 3 SAS SATA JBOD Enclosure User Guide Ver 1 0...
Страница 13: ...Hardware Operation Manual 13 Y3 16S6JS6 Y3 12S6JS6...
Страница 15: ...Hardware Operation Manual 15 Y3 12S6JS6 D...
Страница 43: ...Hardware Operation Manual 43 One SAS Raid subsystem with one SAS JBOD Tower...
Страница 44: ...Hardware Operation Manual 44 One SAS Raid subsystem with two SAS JBOD Tower IN OUT OUT...
Страница 45: ...Hardware Operation Manual 45 One SAS Raid subsystem with three SAS JBOD Tower IN OUT OUT...
Страница 46: ...Hardware Operation Manual 46 One SAS Raid subsystem with four SAS JBOD Tower IN OUT OUT...