![Yotta 3 SAS Скачать руководство пользователя страница 37](http://html1.mh-extra.com/html/yotta/3-sas/3-sas_user-manual_3520999037.webp)
Hardware Operation Manual
37
I
I
I
n
n
n
s
s
s
t
t
t
a
a
a
l
l
l
l
l
l
t
t
t
h
h
h
e
e
e
Y
Y
Y
o
o
o
t
t
t
t
t
t
a
a
a
3
3
3
J
J
J
B
B
B
O
O
O
D
D
D
S
S
S
y
y
y
s
s
s
t
t
t
e
e
e
m
m
m
i
i
i
n
n
n
a
a
a
R
R
R
a
a
a
c
c
c
k
k
k
You are shipped with
one rack mounting kit for each Yotta 3 JBOD system that
you intend to rack mount. Yotta 3 JBOD system is designed for installation into an
industry-standard 19-inch rack mount cabinet. Following the use of this section
for installing the Yotta 3 JBOD system into a Rack
Step1: Assemble and adjust the slide Rails
a. Insert rear slide rail into left (right) slide rail
b. Adjust the length of the slide rails
c. Install P4*8M Screw and M4 NUT as figure 1
d. Determine where in the rack, the subsystem is going to be.
Install the brackets in the rack. Secure each side of the
brackets with two position screws through the front rack
posts, and two position screws through the rear rack posts.
When the rails can be properly fitted to the rack posts,
Fasten the screws.
Figure 1: Assembly Slid rail and rack posts
Содержание 3 SAS
Страница 1: ...Yotta 3 SAS SATA JBOD Enclosure User Guide Ver 1 0...
Страница 13: ...Hardware Operation Manual 13 Y3 16S6JS6 Y3 12S6JS6...
Страница 15: ...Hardware Operation Manual 15 Y3 12S6JS6 D...
Страница 43: ...Hardware Operation Manual 43 One SAS Raid subsystem with one SAS JBOD Tower...
Страница 44: ...Hardware Operation Manual 44 One SAS Raid subsystem with two SAS JBOD Tower IN OUT OUT...
Страница 45: ...Hardware Operation Manual 45 One SAS Raid subsystem with three SAS JBOD Tower IN OUT OUT...
Страница 46: ...Hardware Operation Manual 46 One SAS Raid subsystem with four SAS JBOD Tower IN OUT OUT...