JOHNSON CONTROLS
39
SECTION 4 – INSTALLATION
Form 150.63-NM9
Issue date: 5/20/2021
4
Figure 11 -
Control Wiring
* Factory wired with optional transformer.
LD28296
POWER SUPPLY* 120V-1PH-60Hz L TO 2
EVAP BLOWER STAR CONTACTS
REMOTE EMERGENCY CUTOFF
(MUST BE CLOSED TO OPERATE)
CHILLER RUN STATUS SYSTEM 1
CHILLER RUN STATUS SYSTEM 2
SYS # 1 ALARM STATUS
SYS # 2 ALARM STATUS (ON 2ND CIRCUIT ONLY)
TB1
2
L
5
23
24
GRD
GRD
GRD
25
26
27
28
29
30
31
32
GRD
It is possible that multiple sources of
power can be supplying the unit power
panel. To prevent serious injury or death,
the technician should verify that NO
LETHAL VOLTAGES are present inside
the panel AFTER disconnecting power,
before working on equipment.
The unit evaporator heater uses 120 VAC.
Disconnecting 120 VAC power from the
unit, at or below freezing temperatures,
can result in damage to the evaporator
and unit as a result of the chilled liquid
freezing.
Control wiring
LD28295
CTB1
51
13
14
13
50
SYSTEM 2 THERMOSTAT (SUCTION PRESSURE CONTROL ONLY)
SYSTEM 1 THERMOSTAT (SUCTION PRESSURE CONTROL ONLY)
AIR FLOW SWITCH AND REMOTE START/STOP
21
13
20
13
PWM INPUT (CAN ONLY BE USED WITH DISCHARGE AIR
TEMP CONTROL)
LOAD LIMIT INPUT
Содержание YCUL0020
Страница 4: ...JOHNSON CONTROLS 4 Form 150 63 NM9 Issue date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 10: ...JOHNSON CONTROLS 10 Form 150 63 NM9 Issue date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 14: ...JOHNSON CONTROLS 14 Form 150 63 NM9 Issue date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 40: ...JOHNSON CONTROLS 40 Form 150 63 NM9 Issue date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 53: ...JOHNSON CONTROLS 53 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Страница 55: ...JOHNSON CONTROLS 55 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Страница 57: ...JOHNSON CONTROLS 57 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Страница 59: ...JOHNSON CONTROLS 59 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Страница 61: ...JOHNSON CONTROLS 61 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Страница 63: ...JOHNSON CONTROLS 63 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Страница 65: ...JOHNSON CONTROLS 65 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Страница 67: ...JOHNSON CONTROLS 67 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Страница 69: ...JOHNSON CONTROLS 69 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Страница 71: ...JOHNSON CONTROLS 71 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Страница 73: ...JOHNSON CONTROLS 73 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Страница 75: ...JOHNSON CONTROLS 75 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Страница 77: ...JOHNSON CONTROLS 77 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Страница 79: ...JOHNSON CONTROLS 79 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Страница 81: ...JOHNSON CONTROLS 81 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Страница 83: ...JOHNSON CONTROLS 83 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Страница 85: ...JOHNSON CONTROLS 85 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Страница 87: ...JOHNSON CONTROLS 87 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Страница 102: ...JOHNSON CONTROLS 102 Form 150 63 NM9 Issue date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 108: ...JOHNSON CONTROLS 108 Form 150 63 NM9 Issue date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 158: ...JOHNSON CONTROLS 158 Form 150 63 NM9 Issue date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 177: ...JOHNSON CONTROLS 177 Form 150 63 NM9 Issue date 5 20 2021 Notes...