York WORLD 50 HZ K3EU180A50 Скачать руководство пользователя страница 5

4. All pulleys are factory aligned.

5. All supply air motor pulleys are factory set at two “turns

open.”

After the supply air blower motor is operating, adjust the resis-
tances in both the supply and the return duct systems to bal-
ance the air distribution throughout the conditioned space. The
job specifications may require that this balancing be done by

someone other than the equipment installer.

To check the supply air airflow after the the initial balancing has
been completed:

1. Drill two holes

5

16

" (8mm) dia. in the side panel as shown in

Figure 5.

2. Insert at least 8" (200mm) of

1

4

" (6.3mm) O.D. tubing into

each of these holes for sufficient penetration into the air
flow on both sides of the evaporator coil.

NOTE: The tubes must be inserted and held in a position per-

pendicular to the air flow so that velocity pressure will
not affect the static pressure reading.

3. Using an inclined manometer, determine the pressure drop

across a dry evaporator coil. Since the moisture on an
evaporator coil may vary greatly, measuring the pressure
drop across a wet coil under field conditions would be inac-
curate. To assure a dry coil, the refrigerant system should
be de-energized while the test is being run.

4. Knowing the pressure drop across a dry coil, the actual air-

flow through the unit can be determined from the curve in
Figure 6.

If the airflow is above or below the specified valve, the supply
air motor pulley may have to be readjusted. After one hour of

operation, check the belt and pulleys for tightness and align-
ment.

WARNING: Failure to properly adjust the total system air quan-

tity can result in extensive blower damage.

After readings have been obtained, remove the tubes and seal
up the drilled holes in the side panel with

5

16

" (8mm) dia. dot

plugs (P/N 029-13880) available through normal parts ordering
procedure.

Unitary Products Group

5

035-12124-000 Rev. A (0501)I

Blower Motor

HP/kW

Power Supply

FLA

LRA

Maximum

Fuse Size* Amps

Maximum

Wire Length* * Ft.(m)

3 / 2.2

380/415-3-50

5.2

37.0

10

400 (122)

* Dual element, time delay fuses.

** Based on three 60° C, 14 AWG, insulated copper conductors in steel conduit and a 3% voltage drop.

TABLE 4 - ELECTRICAL DATA

NOTE; SHUT DOWN THE REFRIGERANT SYSTEM BEF-

ORE TAKING ANY TEST MEASUREMENTS TO AS-
SURE A DRY EVAPORATOR COIL

FIG 4 - TYPICAL MOTOR MOUNTING ASSEMBLY

FIG 5 - HOLE LOCATIONS

(559)

(8)

(8)

(254)

( 4 5 7

TO DETERMINE PRESSURE DROP READINGS
ACROSS THE DRY EVAPORATOR

FIG 6 - PRESSURE DROP VS SUPPLY AIRFLOW

Содержание WORLD 50 HZ K3EU180A50

Страница 1: ...n as a unit is received it should be inspected for possible damage during transit If damage is evident the extent of the damage should be noted on the carrier s delivery receipt A separate request for...

Страница 2: ...the skid These units can be rigged with slings under the bottom skid CAUTION Spreader bars should be used to prevent slings from crushing the unit panels and frame Before rigging any unit determine i...

Страница 3: ...n Pack fiber glass insulation and a sealing material such as Per magum around refrigerant lines where they penetrate a wall to reduce vibration and to retain some flexibility Support all refrigerant l...

Страница 4: ...the refrigerant connections The line should be in sulated where moisture drippage will be objectionable or cause damage to the area Seal the unused drain connec tion with a suitable mastic The 3 76mm...

Страница 5: ...dry coil the refrigerant system should be de energized while the test is being run 4 Knowing the pressure drop across a dry coil the actual air flow through the unit can be determined from the curve i...

Страница 6: ...2 2 20 2 68 404 2 46 2 99 311 2 73 1 Unit resistance is based on a wet evaporator coil and clean filters 2 Available static pressure in IWG Pa to overcome the resistance of the duct system and any acc...

Страница 7: ...tom 4 NOTES 1 Overall dimension of the unit will vary if an electric heater a supply air plenum or a base is used 2 This dimension is required for removal of the DX coil Only 26 660mm is required for...

Страница 8: ...terminals on blower motor contactor 10M Route the control wires into the unit through the other 7 8 22 2mm dia knockout and connect them to the terminals on block 4TB Refer to the unit drawing in Figu...