NOTE: To minimize the possibility of system failure due to dirt

and moisture, a filter-drier must be installed in each liq-
uid line as close to the evaporator as possible. Filter-
driers are not supplied with the evaporator blowers.
They are supplied with the matching condensing sec-
tions.

The temperature required to make or break a brazed joint is
sufficiently high to cause oxidation of the copper unless an
inert atmosphere is provide.

CAUTION: Dry nitrogen should flow through a brazed joint at all

times when heat is being applied and until the joint
has cooled.

The liquid, suction and drain connections inside the unit must
be piped to  the outside. Refer to Unit Dimensions for loca-
tions of the access openings in the unit panel.

Protective grommets are supplied by the factory for field
placement into these access openings.

The blower units are shipped with the coil section side pan-
els suitable for right hand piping connections when viewed
from the return air side of the unit.

The refrigerant piping and the condensate drain connection
may be routed through either side of the unit.

If left hand piping is required, the two panels on the right side
of the coil section can be interchanged with the single panel
on the left hand side of the coil section.

When left hand piping connections are installed, the suction
line must be insulated to prevent moisture from condensing
and being carried into the blower section.

EXPANSION VALVE BULB

The expansion valve bulb must be fastened in a 4 o'clock po-
sition to the suction line outside the cabinet after the piping
connections have been made. Use the clamps supplied with
the valve.

DRAIN CONNECTION

The drain line MUST be trapped because the coil is located
on the negative side of the supply air blower. It must also be
protected from freezing temperatures.

A

7

8

" (22.2mm) OD stub connection is provided within the

cabinet on both ends of the condensate drain pan for either

left hand or right hand piping connections. Refer to Figure 3
for recommended drain piping.

The drain line is usually located on the same end of the coil
section as the refrigerant connections. The line should be in-
sulated where moisture drippage will be objectionable or
cause damage to the area. Seal  the unused drain connec-
tion with a suitable mastic.

The 3" (76mm) dimension must equal or exceed the nega-
tive static pressure developed by the supply air blower. If it
does not, condensate will not drain properly and may over-
flow the drain pan. The trap must be at least 2" (50mm) deep
to maintain a water seal under all operating conditions, espe-
cially during blower start-up.

SUPPLY AIR BLOWER ADJUSTMENT

The RPM of the supply air blower will depend on the re-
quired airflow, the unit accessories and the static resistances
of both the supply and the return air duct systems. With this
information, the RPM for the supply air blower can be deter-
mined from the blower performance in Table 5

Knowing the required blower RPM and the blower motor HP,
the setting (turns open) for the supply air motor pulley can be
determined from Table 3..

Each motor pulley has:

1. A threaded barrel with two flats (or notched recesses) 180

degrees apart.

2. A movable flange with one set screw.

After the movable flange has been rotated to the proper
number of “turns open”, the set screw should be tightened
against the flat on the barrel to lock the movable flange in
place. If the pulley includes a locking collar, the locking collar
must be loosened to adjust the setting of the movable
flange.

Note the following:

1. The supply airflow must be within the limitations shown in

Table 2.

2. All pulleys can be adjusted in half-turn increments.

3. The tension on the belt should be adjusted for a deflection

of

3

16

" (5mm) per foot (305mm) of belt span with an applied

force of approximately 3 lbs (1.4kg). This adjustment is
made by moving the blower motor mounting plate. Refer to
Figure 4. Turning the adjustment bolt (B) moves the motor
mounting plate up or down. Note - Never loosen the two
nuts (C). Four hex nuts (A) have to be loosed to move the
mounting plate and retightened after the mounting plate
has been moved to the proper position.

4

Unitary Products Group

035-12124-000 Rev. A (0501)

FIG 3 - RECOMMENDED DRAIN PIPING

(76)

(50)

TURNS OPEN*

BLOWER DRIVE RANGE (RPM)

615-800

5

615

4

652

3

689

2

726

1

763

0

800

* Pulleys can be adjusted in half-turn increments.

TABLE 3 - SUPPLY AIR BLOWER MOTOR PULLEY
ADJUSTMENT

Содержание WORLD 50 HZ K3EU180A50

Страница 1: ...n as a unit is received it should be inspected for possible damage during transit If damage is evident the extent of the damage should be noted on the carrier s delivery receipt A separate request for...

Страница 2: ...the skid These units can be rigged with slings under the bottom skid CAUTION Spreader bars should be used to prevent slings from crushing the unit panels and frame Before rigging any unit determine i...

Страница 3: ...n Pack fiber glass insulation and a sealing material such as Per magum around refrigerant lines where they penetrate a wall to reduce vibration and to retain some flexibility Support all refrigerant l...

Страница 4: ...the refrigerant connections The line should be in sulated where moisture drippage will be objectionable or cause damage to the area Seal the unused drain connec tion with a suitable mastic The 3 76mm...

Страница 5: ...dry coil the refrigerant system should be de energized while the test is being run 4 Knowing the pressure drop across a dry coil the actual air flow through the unit can be determined from the curve i...

Страница 6: ...2 2 20 2 68 404 2 46 2 99 311 2 73 1 Unit resistance is based on a wet evaporator coil and clean filters 2 Available static pressure in IWG Pa to overcome the resistance of the duct system and any acc...

Страница 7: ...tom 4 NOTES 1 Overall dimension of the unit will vary if an electric heater a supply air plenum or a base is used 2 This dimension is required for removal of the DX coil Only 26 660mm is required for...

Страница 8: ...terminals on blower motor contactor 10M Route the control wires into the unit through the other 7 8 22 2mm dia knockout and connect them to the terminals on block 4TB Refer to the unit drawing in Figu...

Отзывы: