15
7.7 Balance refrigerant of the 2-way, 3-way valves
Procedure:
1. Confirm that both the 2-way and 3-way valves are set to the open position.
2. Connect the charge set to the 3-way valve’s service port.
Leave the valve on the charge set closed.
Connect the charge hose with the push pin to the service port.
3. Open the valves (Low side) on the charge set and discharge the refrigerant until the gauge indicates 0.05 to
0.1Mpa.
If there is no air in the refrigeration cycle [the pressure when the air conditioner is not running is higher than 0.1Mpa,
discharge the refrigerant until the gauge indicates 0.05 to 0.1 Mpa. If this is the case, it will not be necessary to
apply a evacuation.
Discharge the refrigeration gradually; if it is discharged too suddenly, the refrigeration oil sill be discharged.
Содержание RVHC-09
Страница 1: ...High Wall Inverter RVHC 09 to 12 SERVICE MANUAL RVHC 09 RVHC 12 SM RVHC 09 12GB 03 07...
Страница 8: ...5 3 Dimension 3 1 Indoor Unit RVKC 09 RVKC 12...
Страница 9: ...6 3 2 Outdoor Unit RVJC 09 RVJC 12 762 275...
Страница 11: ...8 5 Refrigerant cycle diagram...
Страница 12: ...9 6 Wiring diagram 6 1 Indoor Unit RVKC 09 RVKC 12...
Страница 13: ...10 6 2 Outdoor Unit RVJC 09 RVJC 12...
Страница 34: ...31 LED1 LED4 LED5 LED6...
Страница 41: ...www johnsoncontrols com SM RVHC 09 12GB 03 07...