Installation Instructions
•
Connect the duct connections to unit supply and return air ducts.
•
Refer to GA drawing for unit supply and return duct connection sizes and locations.
•
Use canvas connection between unit & supply air duct to avoid the transmission of vibration to the duct.
•
Don't run the unit without filter on return air side.
•
Avoid abnormal duct size increases and reductions. It can adversely affects air and cooling performance.
•
When electrical heater is installed, use fireproof canvas (or similar heat resistance material) between duct & unit
discharge connection.
•
Do the proper duct sizing for air quantity (L/s or cfm) recommended at various External Static Pressures.
•
All ducting should be insulated properly to avoid heat transfer.
•
All ducts should be secured properly to building structural opening should be sealed properly to avoid any air
leakage or condensation.
•
All main branch ducts (without 90° elbow) should be acoustically lined up to min. 10 ft length with the help of all
perforated sheet & fiber glass insulation of recommended density & thickness.
•
Ensure Room thermostat fixed at proper location, sensing return air or room temperatures and set the thermostat
not less than 70° F.
Indoor Units
Outdoor Unit Location and Mounting
•
•
Unit must be lifted by 2” pipe hook rigging sling in base rail, use spreader bar to prevent the sling from damaging
the unit.
•
A minimum clearance of 1 m on serviceable side, 300 mm for air inlets on all sides and 1.5 m for air discharge (unit
top) is required.
•
The unit must be located outdoor only and cannot be connected to duct work.
•
The metal parts of the unit if subjected to salt spray, fog or mist in seacoast areas could lead to rapid
corrosion/oxidation and may lead to premature failure.
•
Interconnecting tubing.
•
Vapor and Liquid lines.
•
Keep all lines sealed until connection is made.
•
Make connections at the indoor coil first.
•
In dual circuit units, ensure Liquid & Suction tubes at indoor & out door units are brazed to
corresponding systems.
•
Connect the filter drier and sight glass at the liquid line in the flow direction marked on the components.
•
Perform the Leak check at all the brazed and flare joints.
•
Perform system Evacuation up to 200 microns.
•
Factory charged unit is sufficient for 25 feet of interconnecting tubing.
•
Maximum length of lines
•
The maximum equivalent length of interconnecting line is 200 feet. Always use the shortest length
possible with minimum number of bends.
•
If the application call for more length of piping, please contact our sales officer.
•
Sizing
Please refer the Guideline for inter connecting piping.
Consult local building codes or ordinances for special installation requirements.
Locating Unit
COMMERCIAL DUCTED SPLITS
07
Содержание Mr. Slim PK-1.6FLA
Страница 1: ...INSTALLATION OPERATION MAINTENANCE MANUAL York Taurus Commercial Ducted Splits 2...
Страница 15: ...G A Drawing Outdoor units YE2CE 072 SINGLE CIRCUIT UNITS COMMERCIAL DUCTED SPLITS 17...
Страница 23: ...WIRING DIAGRAM OUTDOOR UNITS Unit Specifications COMMERCIAL DUCTED SPLITS 25...
Страница 35: ...Exploded View EXPLODED VIEW OUTDOOR UNIT YE2CE240 300 ALL VOLTAGES COOL HEAT PUMP COMMERCIAL DUCTED SPLITS 37...
Страница 37: ......