background image

FORM 201.18-NM1.2

9

YORK INTERNATIONAL

SECTION 2 – RCC OPERATION

GETTING STARTED

When first powered, the message LOSS OF COMM
LINK TO AC SCREW PANEL will appear on the RCC
display. It will disappear when communications are es-
tablished in 30 seconds or less. (If backlight is on but
no display message appears, ribbon cable to display
may be on incorrectly or display is faulty.)

The PLEASE WAIT,,,,, INITIALIZING REMOTE
message will appear next. When this step is completed,
a status message will appear. Unit is then ready for
operation. See page 38 of IOM for chiller operation.

REMOTE PROGRAMMING

COOLING

LOAD

ON

SETPOINTS

LIMIT

OFF

Chilled liquid temperatures (Cooling setpoints), Daily/
Holiday Schedule (key not shown), and Load Limiting
(High Motor Current Unload) setpoints and On/Off con-
trol can be programmed from the RCC unit.

All other parameters may only be monitored from the
RCC; programming must be done at the chiller.

Full details of the above programmable features are
found near pages 126-131 of the Installation, Opera-
tion, Maintenance Manual, Form 201.18-NM1.*

* A copy of this manual is provided with each chiller.
Extra manuals can be obtained through the (York) Bal-
timore Parts Center, Baltimore MD. Ph 1-800-9321701.

SYSTEM STATUS

STATUS

The STATUS KEY will display a single message relat-
ing to the control status of the chiller or the RCC. ‘Gen-
eral’ status messages are shown below. Additional de-
tails are provided in the IOM.

General status messages can be the following:

UNIT SWITCH OFF (switch located on front panel)

DAILY SCHEDULE SHUTDOWN (daily schedule
pre-programmed function)

REMOTE CONTROLLED SHUTDOWN (chiller shut
down by manual OFF signal initiated from RCC)

NO RUN PERMISSIVE (flow switch open; no water
flow OR external device in series when flow switch is
open)

SYS SWITCH OFF (system toggle switches located
on microboard in off position)

NO COOL LOAD (indicates cooling demand rate does
not yet warrant running this system OR loading se-
quence has not progressed far enough to start this sys-
tem – often seen during the first few minutes of opera-
tion)

COMP RUNNING (compressor on)

PUMPING DOWN (pumpdown sequence at start up
or after shutdown in progress)

AR TIMER (6 minute anti-recycle timer allows time
for motor to cool sufficiently between compressor
starts)

AC TIMER (2 minute anti-coincident timer prevents
two compressors from starting at same time)

DISCH LIMITING (discharge pressure has reached the
programmable ‘discharge pressure unload’ setpoint)

SUCT LIMITING (suction temperature has reached a
point where icing may occur on the evap tubes)

CURR LIMITING (motor current has reached the pro-
grammable ‘high motor current unload’ setpoint)

EMS LIMITING (motor current has reached the motor
current unload setpoint determined by an external sig-
nal. See pg. 130 of IOM)

MANUAL OVERRIDE (manual override function
initiated at chiller keypad; setpoints at chiller will con-
trol)

2

Содержание MILLENNIUM

Страница 1: ...INSTALL OPERATION MAINT MILLENNIUM REMOTE CONTROL CENTER FOR STYLE F AIR COOLED SCREW CHILLER New Release Form 201 18 NM1 2 300 28376A NEW EXPANDED USER GUIDE INCLUDED See Section 3...

Страница 2: ...rted 9 Remote Programming 9 System Status 9 System Operating Data 10 System Operating Data Readouts 10 Printing 10 System Faults Shutdowns 10 SECTION 3 REFRIGERATION OVERVIEW 11 Checking for Proper Op...

Страница 3: ...as 4000 ft 1219 m of wiring will allow PRINTER CONNECTION The printer communicates through the RCC RS 232 port which are terminals at TB2 marked TXD RXD and DGND as shown on page 6 INSTALLATION CHECKL...

Страница 4: ...he data fields ENTER ADV Enter key is used to store new values into memory Other keys on the unit are self explanatory PROGRAMMING SETUP AT THE CHILLER Press the PROGRAM key and scroll by repeatedly t...

Страница 5: ...tions link be tween the chiller MicroComputer Control Center and the Remote Control Center has been lost This loss of communications can be the result of a disconnect in the communications cable betwe...

Страница 6: ...YORK INTERNATIONAL 6 LD02734 FIG 1 RCC WIRING CONNECTIONS RCC HARDWARE AND SETUP CONT D RCC Hardware and Setup...

Страница 7: ...FORM 201 18 NM1 2 7 YORK INTERNATIONAL LD02733 FIG 2 REMOTE CONTROL CENTER INSTALLATION DETAILS RCC HARDWARE AND SETUP CONT D 1...

Страница 8: ...then left in the chiller to allow quick printer connect disconnect feature Order extra adapter 957012582 Cost is 10 Printer specs Default settings are 1200 Baud 8 data bits no parity 1500 character bu...

Страница 9: ...Gen eral status messages are shown below Additional de tails are provided in the IOM General status messages can be the following UNIT SWITCH OFF switch located on front panel DAILY SCHEDULE SHUTDOWN...

Страница 10: ...be reviewed by a competent technician for ab normal trends or parameters When the PRINT key is pressed the display will prompt the operator to select either the OPER DATA or the HISTORY to print Selec...

Страница 11: ...ATION CYCLE The refrigeration cycle description that follows can be traced on the refrigerant flow diagram Figure 4 page 13 for an R 22 YCAS F water chiller The refrigerant change of state as it chang...

Страница 12: ...ools it condenses into a liquid Visible through the sys tem sight glass 4 With sufficient cooling a stream of warm high pressure pure liquid refrigerant exits the condenser It is then fed to an expans...

Страница 13: ...High Pressure Vapour Oil COMP Compressor CDR Condenser Coil CLR Cooler EC Economizer Added to some models OC Oil Cooler OS Oil Separator Air Entering Compressor R 22 Refrigerant Circuit Number Thermos...

Страница 14: ...OMP OS CDR OC FAN STAGES AMBIENT AIR TEMP OIL PRESS OIL TEMP m 2 s ECONO TXV LLSOLV On Off SUCTION PRESS TEMP S HEAT DISCH PRESS TEMP S HEAT Compressor Info MC FLA HOURS STARTS RUN TIME SV STEP 0 75 W...

Страница 15: ...G BAR G 1 DISCHARGE PRESSURE ____PSIG BAR G 1 SUCTION TEMP ________________ F C 1 DISCH TEMP __________________ F C 1 OIL TEMP _____________________ F C 1 SAT SUCT TEMP _______________ F C 1 SUCT SUPE...

Страница 16: ...the saturated state Temperature F Pressure PSI 92 173 7 94 179 1 96 184 6 98 190 2 100 195 9 102 201 8 104 207 7 106 213 8 108 220 0 110 226 4 112 232 8 114 239 4 116 246 1 118 252 9 120 259 9 122 26...

Страница 17: ...FORM 201 18 NM1 2 17 YORK INTERNATIONAL LD05447 3 FIG 6 VAPOR COMPRESSION REFRIGERATION CYCLE...

Страница 18: ...YORK INTERNATIONAL 18 This page intentionally left blank...

Страница 19: ...14 770 0909 NEW JERSEY Newark YORK International Corp 908 225 0606 NEVADA Las Vegas YORK International Corp 702 873 2200 NEW YORK Buffalo YORK International Corp 716 633 2172 New York YORK Internation...

Страница 20: ...or of the 2000 U S Olympic Team 36USC380 P O Box 1592 York Pennsylvania USA 17405 1592 Subject to change without notice Printed in USA Copyright by York International Corporation 2000 ALL RIGHTS RESER...

Отзывы: