After the subcooling is verified, the suction superheat
should be checked. The superheat should be checked
only after steady state operation of the unit has been
established, the discharge air temperature (or suction
pressure) has been pulled down to within the control range,
and the unit is running in a fully loaded condition. Correct
superheat setting for a system is 10°F (5.56°C) 18" (46
cm) from the evaporator.
The superheat is calculated as the difference between
the actual temperature of the refrigerant gas in the suc-
tion line and the temperature corresponding to the suc-
tion pressure as shown in a standard pressure/tempera-
ture chart.
Example:
Suction Temp =
46°F
minus Suction Press
60 PSIG converted to Temp
- 34°F
Superheat =
12°F
When adjusting the expansion valve, the adjusting screw
should be turned not more than one turn at a time, allow-
ing sufficient time (approximately 15 minutes) between
adjustments for the system and the thermal expansion
valve to respond and stabilize.
Assure that superheat is set at 10°F (5.56°C).
G
2. Record the suction temperature, suction pressure,
suction saturation temperature, and superheat of
each system below:
SYS 1
SYS 2
Suction temp = _______ _______ °F
Suction Pressure = _______ _______ PSIG
Saturation Temp = _______ _______ °F
Superheat = _______ _______ °F
LEAK CHECKING
G
1. Leak check compressors, fittings, and piping to
assure no leaks.
If the unit is functioning satisfactorily during the initial
operating period, no safeties trip and the compressors
cycle to control discharge air temperature (or suction pres-
sure), the chiller is ready to be placed into operation.
Initial Startup
Содержание MILLENNIUM YCUL0045SC
Страница 146: ...YORK INTERNATIONAL 146 ELEMENTARY DIAGRAM YCUL0045 0095 FIG 16 ELEMENTARY DIAGRAM Elementary Diagrams...
Страница 147: ...YORK INTERNATIONAL FORM 150 63 NM2 147 FIG 16 ELEMENTARY DIAGRAM CONT D LD04355 ELEMENTARY DIAGRAM YCUL0045 0095 5...
Страница 148: ...YORK INTERNATIONAL 148 FIG 16 ELEMENTARY DIAGRAM LD04556 ELEMENTARY DIAGRAM YCUL0045 0095 Elementary Diagrams...
Страница 149: ...YORK INTERNATIONAL FORM 150 63 NM2 149 This page is intentionally left blank 5...
Страница 150: ...YORK INTERNATIONAL 150 FIG 17 ELEMENTARY DIAGRAM ELEMENTARY DIAGRAM YCUL0121 Elementary Diagrams...
Страница 151: ...YORK INTERNATIONAL FORM 150 63 NM2 151 FIG 17 ELEMENTARY DIAGRAM CONT D LD04356 ELEMENTARY DIAGRAM YCUL0121 5...
Страница 152: ...YORK INTERNATIONAL 152 FIG 17 ELEMENTARY DIAGRAM LD04557 ELEMENTARY DIAGRAM YCUL0121 Elementary Diagrams...
Страница 153: ...YORK INTERNATIONAL FORM 150 63 NM2 153 This page is intentionally left blank 5...
Страница 154: ...YORK INTERNATIONAL 154 FIG 18 ELEMENTARY DIAGRAM ELEMENTARY DIAGRAM YCUL0125 0185 Elementary Diagrams...
Страница 155: ...YORK INTERNATIONAL FORM 150 63 NM2 155 FIG 18 ELEMENTARY DIAGRAM CONT D LD04357 ELEMENTARY DIAGRAM YCUL0125 0185 5...
Страница 156: ...YORK INTERNATIONAL 156 FIG 18 ELEMENTARY DIAGRAM LD04558 ELEMENTARY DIAGRAM YCUL0125 0185 Elementary Diagrams...
Страница 157: ...YORK INTERNATIONAL FORM 150 63 NM2 157 This page is intentionally left blank 5...
Страница 158: ...YORK INTERNATIONAL 158 FIG 19 ELEMENTARY DIAGRAM ELEMENTARY DIAGRAM YCUL0211 0275 Elementary Diagrams...
Страница 159: ...YORK INTERNATIONAL FORM 150 63 NM2 159 FIG 19 ELEMENTARY DIAGRAM CONT D LD04358 ELEMENTARY DIAGRAM YCUL0211 0275 5...
Страница 160: ...YORK INTERNATIONAL 160 LD04559 FIG 19 ELEMENTARY DIAGRAM ELEMENTARY DIAGRAM YCUL0211 0275 Elementary Diagrams...
Страница 161: ...YORK INTERNATIONAL FORM 150 63 NM2 161 This page is intentionally left blank 5...
Страница 169: ...NOTES...
Страница 170: ......
Страница 171: ......